Help shape GoConqr. What should we add next?

Mind map

Flood Management

Elemanda M English

Mind map about Flood Management: Hard Engineering, Soft Engineering, Advantages, and Disadvantages

Mind map: Flood Management

Map content

Flood Management

  1. Hard Engineering

    • use of technology to control rivers
    • Expensive
    • Can make some flooding effects worse
    • Can alter water supply and cause conflict
    • Dams and Reservoirs
      • Trap and store water release it in a controlled way
      • very controlled release
      • Hydroelectric power
      • Alters natural ecosystem
      • Very expensive
      • needs regular dredging
      • displaces people
    • Embankments/Artificial Levees
      • raised banks among river make river deeper to hold more
      • Prevents/ decreases the chance of flooding
      • protects surrounding areas
      • alters natural ecosystem
      • Easy to erode
    • Flood Walls
      • Protection barriers in urban areas to protect factories and roads
      • Stops flooding
      • UGLY
      • Expensive
    • Straightening meanders and deepening the river (river channelisation)
      • straightening the river so the water can run more quickly
      • River can hold more before it floods
      • Impacts greatly on the river
      • UGLY
      • Damage natural ecosystem
  2. Soft Engineering

    • Less intrusive
    • Works with natural processes
    • Cheaper and sustainable
    • Do nothing!
      • no change to the ecosystem
      • Free
      • areas get flooded alot
    • Washlands
      • areas of floodplain allowed to flood - not built on - farmland/sports pitches
      • no alterations to river course
      • Prevents flooding in built up areas
      • Aesthetically pleasing
    • Floodplain Zoning
      • controlling what is built on floodplain
      • Doesn't put hospitals/schools near the river
    • Afforestation
      • Increases inception therefore reducing precipitation entering river and sediments
        • reduces precipitation entering river
    • Warning Systems
      • Issued by environment agency - identify areas of risk & issue warnings
      • Houses can be evacuated, possessions moved
      • Areas can get prepared
      • Decreases social effects
      • Doesn't prevent flooding
      • Might miss warnings
  3. Advantages

  4. Disadvantages

  5. Case Study- Three Gorges Dam

    • Advantages
      • protects 100 million people living downriver
      • Generates Hydroelectricity
      • Less air pollution = less damage to peoples health
      • Hydroelectricity= clean, renewable fuel
      • chinas energy used to come from coal (major cause of global warming)
      • 400 million people live in the Yangtze basin (1/3 of chinas population)
      • new jobs
      • controls flooding
      • dosent emit 100 million tonnes of carbon dioxide
      • Busy Shipping
    • Disadvantages
      • Relocation of 1.3 million people
      • Sediment will need dredging
      • Sewage and rubbish trapped behind dam
      • Dam could break
      • Tourism affected
      • Endangered species threat
      • Expensive
      • Ruined vibrant communities
      • Houses cracking
      • Landslides
      • Water level fluctuates
    • Construction
      • Hard Engineering
      • 1994-2006
      • $25.5 billion
      • 181 metres high
      • 2.3 kilometres wide
      • Increased rivers depth by 110 m
    • The Three Gorges Dam is a hydroelectric dam on the Yangtze River by the town of Sandouping, located Yichang, Hubei province, China, East Asia. The Three Gorges Dam is the world's largest hydroelectric powerstation
    • Problem
      • large areas of the drainage basin receive high amounts of rainfall each day
      • infrastructure has been built on floodplains making it impermeable
  6. Hydrograph

    • Urbanisation
      • Tarmac creates an impermeable layer of rock therefore reducing infiltration and increasing surface run-off so water flows into the river channel quicker and results in a flashy hydrograph
    • Amount of Rainfall
      • If there is lots of rainfall the greater the input into a drainage basin hydrological cycle. Soil and rock become saturated so infiltration and percolation stops and surface run-off increases, so water flows into river channel quickly and results in a flashy hydrograph
    • Type of Precipitation
      • If the precipitation falls as snow then infiltration and surface run-off will be decreased because it will remain as surface storage for longer as it is frozen. This will result in a delayed hydrograph
    • Intensity of Rainfall
      • The more intense a rainfall event is the less infiltration will occur resultiing in increased surface run-off and therefore a flashy hydrograph
    • Relief
      • If the drainage has a steep gradient then infiltration will be reduced and surface run-off will be greater as gravity will 'pull' the water down the slope quicker then it can infiltrate. This will result in a flashy hydrograph
    • Deforestation
      • If an area has been deforested then interception will be reduced resulting in more water reaching the ground.This will result in greater infiltrationand surface run-off so more water will reach the river channel more quickly. This will result in a flashy hydrograph
    • Geology
      • if it is a porous rock it allows water in so less surface drainage therefore lower peak discharge
    • Previous Weather Conditions
      • if the weather had already rained alot, the soil would already be waterlogged so it would overflood
    • Temperature
      • If it was warm there would be a lower peak discharge so the water would evaporate & if it was cold there would be a longer lagtime

Information

Description
Mind Map on Flood Management, created by Elemanda M on 28/02/2015.
Created by
Elemanda M
Views
3
Rating

More on Flood and River Management

Feedback

What is it about?

What should we add next?