GoConqr has a new look! Let us know what you think.

Mind map

SAB6#88Quality_Control

Haggen Weg Spanish

Map content

SAB6#88Quality_Control

  1. Project Management Plan

    • Describes how Quality Control will be performed within the Project
  2. Quality Metrics

    • Describes a Project or Product attribute and how it will be measured. Examples: Function Points. Mean Time Between Failure (MTBF). Mean Time To Repair (MTTR)
  3. Quality Checklist

    • It's a structured list that helps to verify that the work of the Project and its deliverables fulfill a ser of requirements
  4. Work Performance Data

    • Planned Vs. Actual Technical Performance
    • Planned Vs. Actual Schedule Performance
    • Planned Vs, Actual Cost Performance
  5. Approved Change Request

    • Defect Repairs
    • Revised Work Methods
    • Revised Schedule
  6. Deliverables

    • Any unique and verifiable product, result or capability that results in a validated deliverable required by the Project
  7. Project Documents

    • Agreements
    • Quality Audit reports and Change logs supported with corrective action plans
    • Training plans and assessments documentation of effectiveness
    • Process documentation obtained using the 7 basic quality tools or the quality management and control tools
    • (...)
  8. OPAs - Organizational Process Assets

    • Organization's Quality Standards and Policies
    • Standard work guidelines
    • Issue and defect reporting procedures and communication policies
    • (...)
  9. Quality Control Measurements

    • Are the documents results of control quality activities. They should be captured in the format specified through the Plan Quality Management Process
  10. Validated Changes

    • Any changed or repaired items are inspected and will be either accepted or rejected before notification of the decision is provided
      • Rejected Items may require rework
  11. Validated Deliverables

    • Control Quality process determines the correctness of deliverables
      • Verified deliverables are an input to Validate Scope for formilized acceptance
  12. Work Performance Information

    • Is the performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas
      • For example: Information about the project requirements fulfillment such as causes for rejection, rework required, or the need for process adjustments
  13. Change Request

    • If the recommended corrective or preventive actions or a defect repair requires a change to the Project Management Plan, a change request should be initiated in accordance with the defined Perform Integrated Change Control
  14. Project Management Plan Updates

    • Quality Management Plan
    • Process improvement plan
    • (...)
  15. Project Documents Updates

    • Quality standards
    • Agreements
    • Quality audit reports and change logs supported with corrective action plan
    • Training plans and assessments of effectiveness
    • Process documentation
      • Information obtained using the 7 basic quality tools
      • Information obtained using the quality management and control tools
    • (...)
  16. OPAs Updates

    • Completed Checklist
    • Lesson learned documentation
    • (...)
  17. 7 Basic Quality Tools

  18. Statistical Sampling

  19. Inspection

  20. Approved Change Request Review

Information

Description
Mind Map on SAB6#88Quality_Control, created by Haggen Weg on 14/06/2015.
Created by
Haggen Weg
Views
10
Rating

More on Quality Control and Inspection

Feedback

What is it about?

What do you think of the new look?

How do you like it?