Case Study 1 - Flash Flood - Boscastle

  1. Location

    • Is in Cornwall
      • Located in the South-West of England
      • On the North Cornish Coast
      • North-West of Plymouth
      • North-East of Newquay
  2. Timeline of Events

    • Heavy Rainfall begins in parts of North Cornwall
      • 12pm
    • River Valency is almost full after 3 hours of torrential rain
      • 3:15pm
    • A 3m Wall of water crashes into Boscastle visitor centre
      • Fast flowing water makes roads impassible
        • 4pm
    • Floods hit peak
      • 5pm
    • Floods start to recede
      • 6pm
  3. Causes

    • Natural Causes
      • Heavy localised rainfall
        • L:and Saturates quickly
          • Water goes straight to Rivers causing it to overflow
      • Topography of the Land is steep valleys
        • The Valleys means that all the water is funnelled into the village
          • Therefore more surface run-off
          • Impermeable surfaces means that the water can't infiltrate into the ground
            • Ground is made of tarmac and slate
      • Narrow River channel
    • Human Causes
      • Boscastle stands on the Confluence of 2 Rivers (Jordan & Valency
        • This means there is lots of water passing through
        • The River has been walled in order to accommodate for the village
          • This means that the river couldn't adjust to the sudden increase in Water
      • The bridge constricts the flow of water
        • This forces the River to burst its banks
      • The village has been built on the rivers flood plains
      • The rivers capacity has been reduced in order for the development of roads & car parks
  4. Effects/Impacts

    • 58 properties were flooded
      • 4 were swept away
    • There were no deaths
      • Around 100,000 residents and visitors were affected
    • 4 footbridges were swept away along the River Valency
    • Boscastle's infrastructure suffered major damage
      • Power and phone services were out
      • Roads were badly damaged
      • The total estimated damage was £2,000,000
  5. Response & Solution

    • Solutions
      • A £4.5 million scheme was put in place to defend Boscastle
        • Better Drainage
          • New Sewer system installed
        • Land re-grading
        • Boscastle Car Parks were raised
        • River made deeper
        • Drains allowed water to run underground
    • Short Term Response
      • Sand Bags put in homes
      • Temporary Accomodation
      • 7 Helicopters sent in
        • Saved 150 people
      • Debris & Silt cleared
    • Long Term Response
      • Restoration
        • Roads & Bridges
        • Water & Sewage
        • Power
      • Donation/Charity
      • Banks & Flood walls were raised
      • River Jordan relief channel made bigger

Images and files in the map

  • Case Study 1 - Flash Flood - Boscastle

Information

Description
GCSE Geography (Book 1 Case Studies) Mind Map on Case Study 1 - Flash Flood - Boscastle, created by Ryan Brace on 06/04/2016.
Created by
Ryan Brace
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?