Contract Practice JCT OVERVIEW

alison_patey0437 T017 & T016 English

Mind map on Contract Practice JCT overview: forms of contract, contract structure, SBC and DB conditions and schedules

Mind map: Contract Practice JCT overview

Map content

Contract Practice JCT OVERVIEW

  1. Which form of Contract?

    • Traditional Procurement - re-measurement
      • SBC 2011 - with Approx Qts (SBC/AQ)
      • Measured Term Contract (MTC)
      • Infrastrucuture Conditions of Contract 2011 (measurement Version)
    • Traditional Procurement - Lump Sum
      • SBC 2011 - with or without Quantities SBCXQ or SBCQ
      • IBC 2011 (IC & ICD)
      • MW Comntract 2011 (MW & MWD)
      • Major Project Construction Contract 2011 MP
      • Building Contract for Home Owner/Occupier (HO/B) 2005 rev 2009
      • Buildig contract and consultancy agreement for home owner/occupier (HO/C & HO/CA) 2005 rev 2009
      • Home repair and maintainance contract (HO/RM) 2006
      • Repair and maintainance contract (RM)2011
    • Traditional Procurement - cost plus
      • Prime cost building contract 2011 (PCC)
    • Design and Build
      • D&B contract 2011 (DB)
      • Infrastructure conditions of contract 2011 (design and construction version)
      • Employers Requirements
        • the brief e.g. floor area/ lighting etc
        • statement of facts
          • site conditions
          • services
        • contract information
        • form of content of CP and CSA
        • specific function of employers agent, QS and CoW if required
      • Contractors Proposals
        • the response to the ER
          • drawings, spec, models, perspectives, videos, method statement, programmees etc.
          • Prov Sums
      • Key roles by emp
        • payment
          • matters relating to valuation and payment driven by contractor
            • Stage payments (alternative A) or periodic payments (Alternative B)
        • EOT
        • L&E
        • Not 'variations' but 'changes'
      • There is no
        • A/CA or independent certifier
        • certificates (statement & Notices)
        • Contract administrated by emp/ EA
          • identified in article 3
          • EA referred to in
            • Clause 2.7.3 (contract docs on site)
            • Clause 3.1 (access to site)
          • acting for emp as set out in writing
      • Contract Sum Analysis
        • required form?
        • basis of valuation of 'changes' and fluctuations
        • can be BQ
        • should inc/identify costs (fees) for design wrk
    • Management forms
      • Management Building Contract (MC) 2011
        • management wks contract agreement tender agreement (MCWC/A) and the management works contract conditions (WCWC/C) 2011
      • Construction Mangement
        • Construction management appointment 2011 (CM/A)
        • Construction management trade contract (CM/TC) 2011
  2. What type of contract?

    • Traditional
      • Lump-sum
      • Re-measurement
      • Prime Cost
    • Design and Build
    • Mangement
      • Mangement Contracting
        • contractural relationship
          • Management contractor
            • employer
              • consultants
              • contract between Emp and MC include:
                • MC 2011
            • WP contractor
            • WP Contractor
            • WP contractor
            • Contract between MC and WP contractor include:
              • MCWC/A 2011 & MCWC/C 2011
      • Construction Management
        • Contractural relationships
          • Employer
            • Construction Manger
            • WP Contractor
            • WP Contractor
            • WP Contractor
            • Consultants
            • Contract between emp and CM include:
              • CM/A 2011
            • contract between Emp & WP contractors include:
              • CM/T 2011
  3. Other Standard forms of contract not JCT

    • NEC
    • GC/Works
    • CA form of building agreement 1982 (3rd ed 2000) 2011 amendments
  4. conpletion in sections?

    • applies to
      • SBC
      • DB
      • IC
  5. Contractors design

    • seperate docs incorporating CDP
      • IC/D 2011
      • MW/D 2011
    • One version of SBC 2011 with CDP incorporated
    • DB 2011 design contractors responsibility except as set out in ER (2.11)
  6. Contract Structure Generally

    • 1.Recitals
    • 2. Articles
    • 3. Contract Particulars
    • 4. Attestation Provision
    • 5. COnditions
    • 6. Scedules
  7. Contract conditions fro SBC and DB

    • 1. Section 1 - definitions and interprutations
    • 2. Section 2 - Carrying out the Works
    • 3. Section 3 - Control of the works
    • Section 4 - Payment
    • Section 5 - Variations (DB Changes)
    • Section 6 - Injury, damage and insurance
    • Section 7 - Assignment, 3rd party rights and collateral warranties
    • Section 8 - Termination
    • Section 9 - Settlement of disputes
  8. Schedule for SBC and DB

    • Schedule 1 - contractors design submission procedure
    • Schedule 2 - variation and acceleration quotation procedure (DB supplemental provision)
    • Schedule 3 - insurance options
    • Schedule 4 - code of practice
    • Schedule 5 - third party rights
    • Schedule 6 - forms of bonds
    • Schedule 7 - fluctuation options
    • Schedule 8 - supplementary provisions
  9. JCT IC and ICD Conditions

    • Section 1- definitions & interprutations
    • Section 2 - Carrying out the works
    • Section 3 - control of the works
    • Section 4 - Payment
    • Section 5 - variations
    • Section 6 - injury damages and insurance
    • Section 7 - assignment and collateral warranties
    • Section 8 - Termination
    • Section 9 - Settlement of disputes
  10. JCT IC & ICD Schedules

    • 1 - Insurance options
    • 2 - named sub-contractors
    • 3 - form of bonds
    • 4 - fluctuation options
    • 5 - supplementary provisions
    • Versions of IC and ICD
      • work of sinple content generally recognised as basic trades of skills without complex services or specialist works
      • contractor can be required to design discrete parts of the works (ICD)
      • where fairly detailed contract provisions are required
      • for use on a basis of with or without qnts. drawings togeeher with BQ or spec or work sch - work can be adeqautely specified
        • non re-measurement or prime cost option
        • no design and build option
  11. MW & MWD Conditions

    • 1 - definitions and interprutations
    • 2 - carrying out the works
    • 3 - control of the works
    • 4 - payment
    • 5 - injury, damage and insurance
    • 6 - termination
    • 7 - settlement of disputes
  12. MW & MWD Schedules

    • 1 - arbitration
    • 2 - fluctuation options
    • 3 - supplemental conditions
  13. SBC Versions

    • With Quantities
      • BQ's/ Drawings/ Conditions
      • Quantities/ contract sum
      • Large value works/ designed by emp
      • BQ and dwgs required to specify works
      • detailed contract provisions
      • Administration by A/CA and QS
      • Contractor can be required to design discrete parts of the works
      • wks can b divided in 2 sections
      • private & local Authority emp
    • Without Quantities
      • Specification/Work Sch/ Drawings
      • quantities (?)/ C. Sum
      • As SBC/Q except no bills
      • Spec/ Work Sch can be used to adequately define the quality and scope of woks (low degree of complexity)
    • With Approx Qts
      • Bill of approx qt/ dwgs
      • quants/ ascertained final sum
      • As SBC/Q except insufficient time/ info to prepare/ complete design
      • Re-measurement
    • Administration
      • Emp appoints A/CA
      • Emp appoints QS
      • Design by employer which is undertaken by consultants and issued under the contract by the A/CA
  14. IC & ICD Generally

    • lump sum contract
    • employer appoints A/CA
      • certificate
    • employer appoints QS
  15. MW & MWD

    • different from SBC & IC
    • time
      • A/CA empowered to make EOT for 'reasons beyond the control of the contractor'
      • provision of Liquidated damages
        • no certificate of non-completion
      • no provision for deferred possession/ partial possession or sectional completion
    • Payment
      • due dates are 4 weekly intervals
      • fluctuation provisions are limited
      • loss and expense limited to variations or prov sums
    • Generally
      • Lump sum contract
      • no QS
      • emp appoints A/CA
    • Control
      • no provision for naming sub-contractors
      • no provision for employer 'direct works'
      • No provision for testing/ opening up works
    • Insurance
      • contractor insures works
        • no provision for emp
      • works & exisitng structures by employer
    • when to use?
      • detailed contract provisions are required
      • the contractor is to carry out and complete the design and the works

Information

Description
T017 & T016 Mind Map on Contract Practice JCT OVERVIEW, created by alison_patey0437 on 11/04/2013.
Views
331
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?