GoConqr has a new look! Let us know what you think.

Mind map

Risk Management

Jiamin Ariel Ong Software Modelling and Analysis Degree English

Map content

Risk Management

  1. Risk Identification

    • Process-related/product-related
    • Risk tree
      • Failure node
      • Cut set of risk tree
    • Use scenarios
    • Knowledge reuse
    • Group sessions
  2. Risk Assessment

    • Qualitative for likelihood and severity
      • Limited conclusions
      • Subjective estimates
      • Easy to use
      • Likelihood of consequences not considered
    • Quantitative for likelihood and severity
      • Risk exposure = Sumc Likelihood(c) x Severity (c)
      • Finer grained than qualitative
      • Not grounded on system phenomena
      • Elicited from domain experts
  3. Risk Control

    • Countermeasures
      • Reduce high-exposure risks
      • Should be cost-effective
        • Measured by Risk Reduction Leverage
          • Exposure of R - New exposure of R if CM is selected, then divide by Cost
          • Select CM with highest RRL values
      • Use elicitation techniques
      • Risk reduction tactics
        • Reduce risk likelihood
        • Avoid risk
        • Reduce consequence likelihood
        • Avoid risk consequence
        • Mitigate risk consequence
      • Reusing known CM
  4. Assess likelihood of risks + severity, likelihood of consequences to control high priority risk

  5. Quantitative risk management

    • Defect Detection Prevention
      • Impact matrix
        • Impact(r, obj) = estimated loss of satisfaction (0 to 1)
        • LAST LINE -> Criticality(r) = Likelihood(r) * Sum(obj)(Impact(r,obj) * Weight(obj))
        • Loss(obj) = Weight(obj) * Sum(r) (Impact(r, obj) * Likelihood(r))
      • CM effectiveness matrix
        • Reduction(cm, r) = estimated reduction of r if cm applied
          • 0 --> no reduction, 1 --> risk elimination
        • LAST LINE -> combinedReduction(r) = 1 -Pcm(1 -Reduction(cm,r))
        • LAST COL -> overallEffect(cm) =Sum(r) (Reduction(cm,r) * Criticality(r))
      • Determine optimal balance risk reduction/CM cost
        • Cost of each CM
        • Risk balance chart -> impact of each R on all obj if CM is selected

Information

Description
Degree Software Modelling and Analysis Mind Map on Risk Management, created by Jiamin Ariel Ong on 17/02/2016.
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?