CHL Chapter 18 Quiz

Descripción

Iahcsmm (CHL Exam) Sterile Processing Test sobre CHL Chapter 18 Quiz, creado por william Hoover el 10/05/2017.
william Hoover
Test por william Hoover, actualizado hace más de 1 año
william Hoover
Creado por william Hoover hace casi 7 años
218
2

Resumen del Recurso

Pregunta 1

Pregunta
A request made to prospective architects,contractors/builders, suppliers, or others to learn the price of a product or service
Respuesta
  • Request for Proposal
  • Bid Request
  • Construction Estimate
  • Contractor Statement

Pregunta 2

Pregunta
An individual or business that signs a contract to perform part of the project that is the responsibility of the contractor
Respuesta
  • Internal Contractor
  • Secondary Contractor
  • Back-Up Contractor
  • Sub Contractor

Pregunta 3

Pregunta
A multi-disciplinary process that focus's on reducing risk from infection throughout planning, design, and construction (including renovation) activities undertaken by a healthcare facility
Respuesta
  • Failure Mode Effect Analysis (FMEA)
  • Infection Control Risk Assessment (ICRA)
  • Requested Proposal Plan (RPP)
  • Construction Proposal Plan (CSP)

Pregunta 4

Pregunta
The cost to acquire or make improvements to a long-term asset such as a building, property, or equipment
Respuesta
  • General Fund Acquisition
  • General Fund Expenditure
  • Capital Expenditure
  • Capital Acquisition

Pregunta 5

Pregunta
An unlicensed person who typically plans changes that do not relate to regulatory (building code) requirements
Respuesta
  • Designer
  • Architect
  • Draftsman
  • Contractor

Pregunta 6

Pregunta
A licensed professional who focuses on the aesthetic design of buildings and spaces, structures, mechanical systems, acoustics, regulatory, and other requirements needed to make buildings useful and safe for their occupancy
Respuesta
  • Draftsman
  • Architect
  • Designer
  • Contractor

Pregunta 7

Pregunta
The act of purchasing a product or service from an external provider that could alternatively be provided by the facilities own employees
Respuesta
  • PRN Contract
  • Sub-Contract
  • Rental
  • Outsource

Pregunta 8

Pregunta
A revision to a construction purchase order issued by a buyer to a contractor or service provider
Respuesta
  • Request for Revision
  • Change Order
  • Contractor Revision
  • Designer Change

Pregunta 9

Pregunta
An initial step in project planning is to form a ______ that includes physicians, care givers, central service leaders, department managers, technicians, and infection prevention specialists
Respuesta
  • Strategic Project Planning Team
  • Infection Control Team
  • Patient Protection Team
  • Environmental Audit Team

Pregunta 10

Pregunta
A study that considers safety concerns applicable to the environment, employees, and community
Respuesta
  • Feasibility Study
  • Patient Impact Study
  • Environmental Impact Study
  • Infection Control and Waste Impact Study
Mostrar resumen completo Ocultar resumen completo

Similar

CHL Chapter 4 Exam
william Hoover
CHL Chapter 3 Quiz
william Hoover
CHL Chapter 7 Quiz
william Hoover
CHL Chapter 5 Exam
william Hoover
CHL Chapter 6 Quiz Exam
william Hoover
CHL Chapter 14 Quiz
william Hoover
CHL Quiz chapter 11
william Hoover
CHL Chapter 20 Quiz
william Hoover
CHL Chapter 8 Quiz
william Hoover
CHL Chapter 16 Quiz
william Hoover
CHL Chapter 10 Quiz
william Hoover