¡GoConqr estrena diseño! Cuéntanos qué te parece.

Fichas

Work Breakdown Structures

Alex Millar Project Management Second Year Uni Inglés 21 fichas

Fichas del conjunto (21)

  1. 1what does a work breakdown structure doit helps to schedule work tasks
  2. 2what is a breakdown?analysis
    deconstruction
    decomposition
    classification
    inspection
  3. 3what is a work breakdown structure?a WBS identifies all the tasks in a project
    It turns the one large, unique complex piece of work into many small, manageable tasks
  4. 4what is a work breakdown structureIt is the first principle of planning
    (i.e deconstruction - breaking project down into tasks)
  5. 5how is a work breakdown structure usedused as a visual project tool to help team
    either as a diagram or as a list
    whatever works
  6. 6what is an Activity on Node diagram?Its a project management term used to refer to a precedence diagramming method
    It uses boxes to denote schedule activities
  7. 7Explain how an Activity on Node diagram would appear?the various boxes (nodes) would be connected from beginning to end by arrows
    These arrow depict a logical progression of the dependencies between the schedule activities
  8. 8How do we know which activity is which?Each node is coded with a letter or a number that correlates to an activity on the project schedule
  9. 9why do we use Activity on Node diagrams?Because they help identify the sequence of tasks
    They outline dependencies and prerequisites
  10. 10What is Critical Path Analysis?The critical path is the longest sequence of activities through the project network
  11. 11Why is is called the critical pathBecause any delay in any of its activities will delay the whole project
    these activities are TIME CRITICAL
  12. 12what does a node in CPA look like?EST LST
    Activity description
    DURATION FLOAT TIME
  13. 13Why are WBS, AoN and CPA diagrams useful?Generally
    + breaks down complex work into manageable tasks
    + visual communication of complex tasks
    + conversation and negotiation generators
    + accessible to people familiar with flowcharts
    + mapping worst case scenario
  14. 14Specific Comments: Work Breakdown StructureIt breaks down complicated work loads into smaller tasks but it does not give any indication of the duration of tasks or if any can be done simultaneously
  15. 15Specific Comments: Activity on NodeThe boxes are small so you have to use a key system to identify the activities
  16. 16Specific Comments: Critical Path AnalysisHelps with resource and people allocation to tasks because it calculates duration and which activities do and do not have float
  17. 17Why does Harvey Maylor suggest that Work Breakdown Structures are importantHe says that they're a preferred tool because it allows people to be responsible for a manageable part of the project
  18. 18what is important to note about project breakdownsthey can be broken down in a number of ways
    - by work
    - by function
    - by physical group (Hardware, software)
  19. 19What is the role of a WBSto create a linked hierarchical order of activities that need to be carried out
    they are all independent units but simultaneously part of the same whole
  20. 20What is a project NOT aboutA project is NOT about slicing it up into different things that need to be done
  21. 21what is a project aboutIt's about getting the different parts to all work together to create something

Información

Descripción
Second Year Uni Project Management Fichas sobre Work Breakdown Structures , creado por Alex Millar el 19/06/2016.
Creado por
Alex Millar
Visitas
6
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?