¡GoConqr estrena diseño! Cuéntanos qué te parece.

Fichas

10 PROJECT COMMUNICATIONS MANAGEMENT

miguelabascal PMP - All Chapters PMP Inglés 7 fichas

Fichas del conjunto (7)

  1. 110.1 Plan Communications ManagementThe process of developing an appropriate approach and
    plan for project communications based on stakeholder’s information needs and requirements, and
    available organizational assets.
  2. 210.2 Manage CommunicationsThe process of creating, collecting, distributing, storing, retrieving and
    the ultimate disposition of project information in accordance with the communications management
    plan.
  3. 310.3 Control CommunicationsThe process of monitoring and controlling communications throughout
    the entire project life cycle to ensure the information needs of the project stakeholders are met.
  4. 4Effective communication means thatthe information is provided in the right format, at the right time, to
    the right audience, and with the right impact.
  5. 5Efficient communication meansproviding only the information that
    is needed.
  6. 6Factors that can affect the choice of communication technology include:Factors that can affect the choice of communication technology include:
    • Urgency of the need for information
    • Availability of technology
    • Ease of Use
    • Project environment.
    • Sensitivity and confidentiality of the information
  7. 7PMB The performance measurement baseline is anapproved plan for the project work to which the project execution is compared, and deviations are measured
    for management control. The performance measurement baseline typically integrates scope, schedule, and cost
    parameters of a project, but may also include technical and quality parameters.

Información

Descripción
PMP PMP - All Chapters Fichas sobre 10 PROJECT COMMUNICATIONS MANAGEMENT, creado por miguelabascal el 13/07/2013.
Creado por
miguelabascal
Visitas
57
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?