- 110.1 Plan Communications ManagementThe process of developing an appropriate approach and
plan for project communications based on stakeholder’s information needs and requirements, and
available organizational assets. - 210.2 Manage CommunicationsThe process of creating, collecting, distributing, storing, retrieving and
the ultimate disposition of project information in accordance with the communications management
plan. - 310.3 Control CommunicationsThe process of monitoring and controlling communications throughout
the entire project life cycle to ensure the information needs of the project stakeholders are met. - 4Effective communication means thatthe information is provided in the right format, at the right time, to
the right audience, and with the right impact. - 5Efficient communication meansproviding only the information that
is needed. - 6Factors that can affect the choice of communication technology include:Factors that can affect the choice of communication technology include:
• Urgency of the need for information
• Availability of technology
• Ease of Use
• Project environment.
• Sensitivity and confidentiality of the information - 7PMB The performance measurement baseline is anapproved plan for the project work to which the project execution is compared, and deviations are measured
for management control. The performance measurement baseline typically integrates scope, schedule, and cost
parameters of a project, but may also include technical and quality parameters.
Informações
- Descrição
- PMP PMP - All Chapters FlashCards sobre 10 PROJECT COMMUNICATIONS MANAGEMENT, criado por miguelabascal em 13-07-2013.
- Criado por
- miguelabascal
- Visualizações
- 57
- Tags
- Avaliação