River Processes and Pressures Case Study- MEDC Flood: Boscastle, Cornwall

Laura Lui Geography AS - Level Inglés

Contenido del mapa

River Processes and Pressures Case Study- MEDC Flood: Boscastle, Cornwall

  1. Where

    • Boscastle, Cornwall. On the banks of the river valency
  2. When

    • 16th August 2004, The rivers Valency and Jordan both breached their banks.
    • The narrow steep topography of the valley and increased urbanization caused exaggerated surface run-off and a lag time of only 4 hours
  3. Causes

    • 24 hours of heavy prolonged rainfall (500mm (20 in) fell in 4 hours)
    • Rainfall filled river channels and saturated the catchment area
    • Narrow, Steep drainage basin which encourages overland flow
    • Confulence of two rivers in village
    • Underlying impermable rock (slate)
    • Deforestation in the catchment area
    • Increased amount of building on the floodplain
    • Debris blocked bridge, backing up the water behind it
  4. Effects

    • 50 buildings damaged and 25 business properties destroyed
    • 500 people evacuated
    • RAF helicopter from nearby Lesnewth airlifted the most vulnerable
    • 4 footbridges washed away and road bridge structuarlly damaged
    • Over 100 cars washed out to sea
    • Damage estimated to cost £20 million
    • Insurance premiums rose
  5. Response- Short term

    • Environment Agency issued flood warnings in the area and notified emergency services including Police, FIre and Armed forces to help
    • Emergency services mounted a relief effort-airlifting people from houses to safety or hospitals
    • People in nearby villages housed the homeless
    • Army deployed for the initial clear-up from nearby bases
  6. Response- Long term- £4.6m flood defence scheme

    • Widen river banks to allow natural flooding
    • Wideing and deepening of river to allow it to cary more water
    • Raise car park areas above flood levels
    • Remove trees close to river so that they cannot form a dam and hold back water
    • Plant trees on slopes of catchment
    • Increased number of drainage outflows
    • Built flood defence wall

Información

Descripción
AS - Level (Physical Geography) Geography Mapa Mental sobre River Processes and Pressures Case Study- MEDC Flood: Boscastle, Cornwall, creado por Laura Lui el 29/03/2015.
Creado por
Laura Lui
Visitas
1
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué deberíamos añadir?