Installation of ICT Systems

  1. CHANGEOVER METHODS

    • Direct
      • Where the firm stop using the old system and move to the new system straight away
      • If the new system fails there is huge risk
        • Large loss of data
        • No old system to fall back on
      • Requires fewer resources
    • Parallel
      • Minimises the risk of installing a new ICT system
      • The old system is ran alongside the new system
        • Until all people involved are happy with the new system working correctly
      • Expensive
        • twice the work being done
    • Phased
      • New system is installed unit by unit
      • Allows any problems with the unit installed to be sorted before the next unit is installed
      • Only suitable for systems which have various units
    • Pilot
      • Ideal for large organisation that have various locations
      • Suitable where the new system can be used by one branch then transferred to another
      • Implementation is on a smaller and manageable scale
      • Takes longer to implement the system at all branches
  2. HARDWARE INSTALLATION & TESTING

    • Wiring networks
    • Testing hardware
  3. SOFTWARE INSTALLATION AND TESTING

    • Installing software on servers
    • Configuring systems
    • Adding data
    • Testing functionality
  4. DOCUMENTATION

    • User documentation
    • Technical documentation
  5. RESOURCES

    • Installation teams
    • Training

Información

Descripción
A-Level ICT Mapa Mental sobre Installation of ICT Systems, creado por indysingh7285 el 03/02/2016.
Creado por
indysingh7285 · feb 2016
Actualizado
19 may 2018
Visitas
57
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?