1_Time and work

Aptitude Final CSE 40 preguntas 3,0 (1 valoración)

Hacer el test

Este test tiene tiempo límite, así que se abre en el reproductor de siempre.

Preguntas del test (40)

  1. 1A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is :
    1. A1/4
    2. B1/10
    3. C7/15
    4. D8/15
  2. 2A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:
    1. A9 1/5 days
    2. B9 2/5 days
    3. C9 3/5 days
    4. D10
  3. 3A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?
    1. A12
    2. B15
    3. C18
    4. D16
  4. 4A is thrice as good as workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in:
    1. A22 1/2
    2. B22 2/3
    3. C11 1/4
    4. D7 1/5
  5. 5A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for Rs. 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C?
    1. A300
    2. B200
    3. C400
    4. D600
  6. 6

    A can finish a work in 18 days and B can do the same work in 15 days. B worked for 10 days and left the job. In how many days, A alone can finish the remaining work?
    1. A5
    2. B5 1/2
    3. C6
    4. D7
  7. 74 men and 6 women can complete a work in 8 days, while 3 men and 7 women can complete it in 10 days. In how many days will 10 women complete it?
    1. A10
    2. B20
    3. C30
    4. D40
  8. 8P can complete a work in 12 days working 8 hours a day. Q can complete the same work in 8 days working 10 hours a day. If both P and Q work together, working 8 hours a day, in how many days can they complete the work?
    1. A5 5/11
    2. B6 6/11
    3. C7 7/11
  9. 910 women can complete a work in 7 days and 10 children take 14 days to complete the work. How many days will 5 women and 10 children take to complete the work?
    1. A6
    2. B7
    3. C3
    4. D4
  10. 10If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be
    1. A4
    2. B5
    3. C6
    4. D7

Información

Descripción
b Test sobre 1_Time and work, creado por Aptitude Final CSE el 01/08/2016.
Idioma
English
Visitas
64
Etiquetas
b
Valoración
3,0 de 5 · 1 valoración
Valora este test
Valora este test

Más sobre Arithmetic Word Problems

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?