SOLAR MAINTENANCE
Map content
SOLAR MAINTENANCE
SOLAR STRUCTURE
- Photo of solar structure from each side
- Top, side, front and back view photos
- Direction of solar structure
- Take photo with compass or app in cellphone
- Photo has to be clearly with solar structure in the background
- Direction: North
- OK
- Direction: South, East, Weast
- Make a plan to fix direction solar structure
- Direction: North
- Photo has to be clearly with solar structure in the background
- Take photo with compass or app in cellphone
- Photo of solar structure from each side
DC CABINET
- Type DC system
- Take panoramic photo
- PU
- Take photo quantity of PUs
- Check if it is operating
- Measure voltage of each PU before and after cleaning
- Measure voltage of each PU before and after cleaning
- Rectifier
- Take photo quantity of rectifier
- Check if it is operating
- Consumption of site
- DC system with CSU
- Take photo in CSU
- DC system without CSU
- Measure current of each equipment in breaker
- Measure voltage in breakers
- DC system with CSU
- LLVD and BLVD breaker
- Take photo of breakers
- Type DC system
MONITORING
- No have
- Recover monitoring
- Have
- Configurate parameters
- Battery capacity
- 50 Ah/battery
- Battery shunt configuration
- Merge
- LLVD and BLVD voltage
- LLVD: 45V
- BLVD: 43.2
- DC Low voltage
- 47.5 V
- Battery charge current coef.
- 0.20
- Battery capacity
- Check Status
- PU
- A: 0A
- Move PU to another slot
- PU work
- Problem with DC system
- PU doesn't work
- Change PU
- PU work
- Move PU to another slot
- A > 0A
- OK
- A: 0A
- Rectifier
- All working
- Ok
- 1 or more aren't working
- Move rectifier to another slot
- Rectifier work
- Problem with DC system
- Rectifier doesn't work
- Change PU
- Rectifier work
- Move rectifier to another slot
- All working
- Battery
- Check all CB are working
- 1 or more aren't working
- Configurate parameters
- All CB are working
- OK
- 1 or more aren't working
- Check all CB are working
- PU
- Configurate parameters
- No have
BATTERY
- Cable connection
- Check if battery is correctly connected
- Damaged cable
- Replace cable
- Damaged terminals
- Replace terminals
- Misaligned terminals
- Tighten terminals
- Damaged cable
- Check if battery is correctly connected
- Light status
- Alarmed
- Reset battery
- Alarmed
- Make test battery
- OK
- NOK
- Replace battery
- Make test battery
- No alarmed
- OK
- Alarmed
- Reset battery
- Lights off
- Measure voltage and current of battery
- V<47 V , A < 1 A
- Measure voltage in cables from breakers
- V > 0
- Replace battery
- V=0
- Check cable and breaker of batteries
- V > 0
- Measure voltage in cables from breakers
- V<47 V , A >= 1A
- Charge battery
- V>47 V , A < 1A
- OK
- V>47 V , A > 1A
- OK
- V<47 V , A < 1 A
- Measure voltage and current of battery
- Alarmed
- Type of battery
- Different type
- Replace battery to have same type of batteries
- Acid
- Narada
- Shoto
- BSB
- Leoch
- Lithium
- Shoto
- VMC
- ZTT
- Different type
- Physical status
- Swollen battery
- Change battery
- Corroded terminals
- Swollen battery
- Cable connection
SOLAR BOX
- Terminal status
- Solar groups no have terminals
- Install teminals
- Solar groups no have terminals
- Measure voltage of each solar group
- < 80 V
- Before 5:00 p.m.
- Check if one by one solar panel of this solar group if are broken
- Replace damaged solar panel
- Check if one by one solar panel of this solar group if are broken
- After 5:00 p.m
- Check the next day earlier
- < 80 V
- Check if one by one solar panel of this solar group if are broken
- Replace damaged solar panel
- Check if one by one solar panel of this solar group if are broken
- > 80 v
- OK
- < 80 V
- Check the next day earlier
- Before 5:00 p.m.
- < 80 V
- Measure current of each solar group
- 0 A
- Before 5:00 p.m.
- Check if one by one solar panel of this solar group if are broken
- Replace damaged solar panel
- Check if one by one solar panel of this solar group if are broken
- After 5:00 p.m
- Check the next day earlier
- 0 A
- Check if one by one solar panel of this solar group if are broken
- Replace damaged solar panel
- Check if one by one solar panel of this solar group if are broken
- >0 A
- OK
- 0 A
- Check the next day earlier
- Before 5:00 p.m.
- 0 A
- Physical status
- Damaged solar box (broken, corroded)
- Replace solar box
- Damaged solar box (broken, corroded)
- Terminal status
SOLAR PANELS
- Physical status
- Damaged solar panels
- Replace solar panels
- Damaged solar panels
- Connector status
- Wrong connections
- Fix connection
- Damaged cable
- Replace cable
- Wrong connections
- Clean solar panels
- Take photo before cleaning
- Take photo during cleaning
- Take photo after cleaning
- Physical status
GENERATOR
- Data plate
- Take photo of generator data
- Fuel level
- Check if generator has enough fuel
- Missing fuel
- Refill fuel
- Enough fuel
- OK
- Missing fuel
- Check if generator has enough fuel
- Operation
- Check if generator runs
- Run
- OK
- No run
- Check with NOC
- Run
- Check if generator runs
- Data plate