Mind map
Methodological Approach
Map content
Methodological Approach
Phase 1– Construction of the Observational Database
- Step 1.1: Selection and integration of hydrological and climatic time series
- Step 1.2: Validation of precipitation series
- Step 1.3: Data curation, gap filling, and temporal standardization
- Step 1.4: Assembly of the final database for predictive modeling
Phase 2 – Development of Model 1 (Proxy)
- Step 2.1: Selection of the predictor variable set (Set 1)
- Step 2.2: Construction and training of Model 1
- Step 2.3: Cross-validation and testing with actual observation periods
- Step 2.4: Generation of the proxy series
Phase 3 – Development of Model 2 (Final)
- Step 3.1: Selection of the predictor variable set (Set 2)
- Step 3.2: Construction and training of Model 2
- Step 3.3: Cross-validation and testing with actual observation periods
Phase 4 – Future Projections and Flood Risk Analysis (CMIP6)
- Step 4.1: Construction of the CMIP6 database
- Step 4.2: Application of Model 1 to generate a future proxy series
- Step 4.3: Application of Model 2 to estimate future water levels
- Step 4.4: Evaluation of results and flood risk analysis
Information
- Description
- Técnico Artigo 3 Mind Map on Methodological Approach, created by Ícaro Andrade on 12/08/2025.
- Created by
- Ícaro Andrade
- Views
- 0
- History
-
- Created by Ícaro Andrade · Jun 4, 2025
- Copied by Ícaro Andrade · Aug 12, 2025
- Rating