Mind map
MEDC Flooding - Boscastle, Cornwall 2004 - River Valency
Map content
MEDC Flooding - Boscastle, Cornwall 2004 - River Valency
Facts & Figures
- 16th August 2004
- 200,000 litres of rain/second
- 25 businesses destroyed
- 50 buildings flood damaged
- 4 footbridges washed away
- estimated payout of £20 million
Effects
- Destruction of homes and businesses
- Damage to vehicles
- Bridges & Roads damaged
- Tons of mud & debris left in lower part of village
- Local economy largely affected - rely on tourisim
- Stress & anxiety of local people
Who was affected
- people living in village
- rely on tourism as an income
- tourists who visit area
- Insurance Companies
- Local Businesses
- Rescue services
- Local hospital
- people living in village
Causes
- heavy rainfall - remains of hurrican Alex
- Wet summer - ground already saturated so surface run-off was increased
- small river basin, impermeable upland, steep valley sides - increase surface run-off
- Large amounts of concrete in town - increased surface run off
- Bridges blocked material flowing
Management - £6.4 million flood defence scheme
- allow tress to grow in the upper basin
- rebuild bridges - but higher and wider
- widen and deepen the river channel
- defence walls to be built
- restrict building close to the river - have grass verges for over flow
- encourage land owners to maintain vegetation on valley sides
- raise car park above flood level
- remove trees close to river bank
- new pumping station
Information
- Description
- GCSE Geography - Case Studies Mind Map on MEDC Flooding - Boscastle, Cornwall 2004 - River Valency, created by Jack Brammar on 28/03/2015.
- Created by
- Jack Brammar
- Views
- 1
- Tags
- Rating