Flashcards
Flood in an MEDC
Flashcards do conjunto (13)
- 1Place:Carlisle, England
- 2Date:8th January, 2005
- 3River:Eden
- 4HEAVY RAINFALL: How much rainfall fell in how many hours?200mm of rain in 36 hours
- 5URBAN AREA: how much discharge in cumecs?1520 cumecs
- 6How many deaths?3
- 7How many businesses were shut down?350
- 8How many jobs were at risk?3000
- 9What illnesses increased after the floods?Stress-related illnesses.
- 10When was the Eden and Petteril Flood Alleviation Scheme completed and what did it do?2008 - it involved building up flood defence walls and levees on the rivers.
- 11When was the Eden and Petteril Flood Alleviation Scheme completed and what did it do?2008 - it involved building up flood defence walls and levees on the rivers.
- 12What were the purpose of the leaflets distributed?To explain the flood warnings and to tell people how to prepare beforehand.
- 13What does the local council distribute when flood warnings have been issued?Sandbags.
Informações
- Descrição
- FlashCards sobre Flood in an MEDC, criado por ninaknowles em 08-04-2014.
- Criado por
- ninaknowles
- Visualizações
- 19
- Tags
- Avaliação