  1. Section AP

    • APO.2
      • Meeting the performance requierments
      • APO.7
        • Relevant performance requierments
        • AP1.5
          • Compliance with all PR #
            • Compliance with all performance requierments.
    • General Provisions
  2. Section BP

    • BP1.1
      • During construction & use #
        • A building or structure, during construction & use, with appropriate degrees of reliability must... 
      • BP1.2
        • Resistance of material & forms of constr #
          • The structural resistance of material & forms of construction must be determiand by using five percentiles of characteristic material properties with appropriate allowance for.....
        • BP1.3
          • Glass Installation
          • BP1.4
            • Flood Hazard Area
              • A building in a flood hazard area must be designed & constructed, to the degree necessary, to resist flotation, collaps or significante permanate movement resulting from hydrostatic, hydronamic, erosion & scour, winds & other actions during a define event.....
    • Structural Provisions
  3. Section CP

    • Fire Resistance
    • CP1
      • Structural Stability
      • CP2
        • Avoid Spreed of Fire
        • CP3
          • Protection from Spreed of Fire
            • A building must be protected from the spreed of fire, smoke & allow surficient time to safeley evacuate.
          • CP4
            • Tenable conditions during evacuation
            • CP5
              • Concrete external wall
                • To avoide an outwards collaps to tilt-up panales or concrete panals in a fire
              • CP6
                • Avoid spreed of frie
                  • A building must have elements, which will, to the degree nescesary, avoid the spreed of fire from service equipment.....
                • CP7
                  • Operation of Emergency Equipment
                  • CP8
                    • Element to reist spreed of fire
                    • CP9
                      • Access Provided
  4. Section DP

    • Access & engress
    • DP1
      • Access
        • DP1 Dose not apply to a class 4 building
      • DP2
        • Moving safely with-in building
        • DP3
          • Pepole Falling
            • Look at the limitations of DP3
          • DP4
            • Exits
            • DP5
              • Evacuating Occupants
              • DP6
                • Path of tralvel
                • DP7
                  • Exit by Lift
                  • DP8
                    • Dissability Parking
                      • Look into limittations
                    • DP9
                      • Inbuilt Communication Systerms
  5. Section FP

    • Damp & Weather Proofing
    • FP1.1
      • Surface Water RE of 20yrs
      • FP1.2
        • Surface Water RE of 100yrs
        • FP1.3
          • Drainage Systems RE 20yrs
          • FP1.4
            • Roof, External Walls *
              • Roofs, External Walls,openings e.g windows & doors must prevent penetration of water.....
            • FP1.5
              • Ground Moisture
                • Look in limitations
              • FP1.6
                • Overflow
                • FP1.7
                  • Prevention
    • FP2.1
      • Suitable Sanitaries
      • FP2.2
        • Laundering Facillities
        • FP2.3
          • Facilities Provided
          • FP2.4
            • Suitable Means
            • FP2.5
              • Sanitary Compartments
              • FP2.6
                • Micro-organisam Controle
    • FP3
      • Room Hight
      • FP3.1
        • Room Hight
    • FP4
      • Light & Ventilation
      • FP4.1
        • Natural Lighting
        • FP4.2
          • Illuminance
          • FP4.3
            • Outdoor Air
            • FP4.4
              • Mechanical Air
              • FP4.5
                • Contaminated Air
    • FP5
      • Sound Transmission & Insulation
      • FP5.1
        • Separating Floors
        • FP5.2
          • Separating Walls
          • FP5.3
            • Floor , Sound Insulation
            • FP5.4
              • Separating Floors
              • FP5.5
                • Transmission Insulation
                • FP5.6
                  • Sound Insulation
  6. Section JP

    • Energy Efficiancy
    • JP1
      • Appropriate Energy
      • JP2
        • Left Blank
        • JP3
          • Heating

Informationen

Beschreibung
This is a mind map of the BCA, sections & parts location in volume one for Performance Requirments.
Erstellt von
John Magill
Aufrufe
11
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck