GoConqr has a new look! Let us know what you think.

Mind map

PERFORMANCE REQUIERMENRT

John Magill English

Map content

PERFORMANCE REQUIERMENRT

  1. Section AP

    • APO.2
      • Meeting the performance requierments
      • APO.7
        • Relevant performance requierments
        • AP1.5
          • Compliance with all PR #
            • Compliance with all performance requierments.
    • General Provisions
  2. Section BP

    • BP1.1
      • During construction & use #
        • A building or structure, during construction & use, with appropriate degrees of reliability must... 
      • BP1.2
        • Resistance of material & forms of constr #
          • The structural resistance of material & forms of construction must be determiand by using five percentiles of characteristic material properties with appropriate allowance for.....
        • BP1.3
          • Glass Installation
          • BP1.4
            • Flood Hazard Area
              • A building in a flood hazard area must be designed & constructed, to the degree necessary, to resist flotation, collaps or significante permanate movement resulting from hydrostatic, hydronamic, erosion & scour, winds & other actions during a define event.....
    • Structural Provisions
  3. Section CP

    • Fire Resistance
    • CP1
      • Structural Stability
      • CP2
        • Avoid Spreed of Fire
        • CP3
          • Protection from Spreed of Fire
            • A building must be protected from the spreed of fire, smoke & allow surficient time to safeley evacuate.
          • CP4
            • Tenable conditions during evacuation
            • CP5
              • Concrete external wall
                • To avoide an outwards collaps to tilt-up panales or concrete panals in a fire
              • CP6
                • Avoid spreed of frie
                  • A building must have elements, which will, to the degree nescesary, avoid the spreed of fire from service equipment.....
                • CP7
                  • Operation of Emergency Equipment
                  • CP8
                    • Element to reist spreed of fire
                    • CP9
                      • Access Provided
  4. Section DP

    • Access & engress
    • DP1
      • Access
        • DP1 Dose not apply to a class 4 building
      • DP2
        • Moving safely with-in building
        • DP3
          • Pepole Falling
            • Look at the limitations of DP3
          • DP4
            • Exits
            • DP5
              • Evacuating Occupants
              • DP6
                • Path of tralvel
                • DP7
                  • Exit by Lift
                  • DP8
                    • Dissability Parking
                      • Look into limittations
                    • DP9
                      • Inbuilt Communication Systerms
  5. Section FP

    • Damp & Weather Proofing
    • FP1.1
      • Surface Water RE of 20yrs
      • FP1.2
        • Surface Water RE of 100yrs
        • FP1.3
          • Drainage Systems RE 20yrs
          • FP1.4
            • Roof, External Walls *
              • Roofs, External Walls,openings e.g windows & doors must prevent penetration of water.....
            • FP1.5
              • Ground Moisture
                • Look in limitations
              • FP1.6
                • Overflow
                • FP1.7
                  • Prevention
    • FP2.1
      • Suitable Sanitaries
      • FP2.2
        • Laundering Facillities
        • FP2.3
          • Facilities Provided
          • FP2.4
            • Suitable Means
            • FP2.5
              • Sanitary Compartments
              • FP2.6
                • Micro-organisam Controle
    • FP3
      • Room Hight
      • FP3.1
        • Room Hight
    • FP4
      • Light & Ventilation
      • FP4.1
        • Natural Lighting
        • FP4.2
          • Illuminance
          • FP4.3
            • Outdoor Air
            • FP4.4
              • Mechanical Air
              • FP4.5
                • Contaminated Air
    • FP5
      • Sound Transmission & Insulation
      • FP5.1
        • Separating Floors
        • FP5.2
          • Separating Walls
          • FP5.3
            • Floor , Sound Insulation
            • FP5.4
              • Separating Floors
              • FP5.5
                • Transmission Insulation
                • FP5.6
                  • Sound Insulation
  6. Section JP

    • Energy Efficiancy
    • JP1
      • Appropriate Energy
      • JP2
        • Left Blank
        • JP3
          • Heating

Information

Description
This is a mind map of the BCA, sections & parts location in volume one for Performance Requirments.
Created by
John Magill
Views
11
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?