Resource Optimization
- find the ways to adjust the use of resoure
- Resource Leveling
- Produce a resource-limited schedule
- lengthens the schedule
- Increases cost
- Limited by
- Amount of resource
- Resource availability
- Others constraints
- Produce a resource-limited schedule
- Resoure Smooting
- Similar to Resource Leveling
- Within the limits of the float
- The activity is not delayed
Develop the Schedule
- Knowledge Area: Time Managament
- Process Group: Planning
- Process: Develop Schedule
- Create the Schedule model
- Is calendar -based
- is Approved
- is realistyc
- Historical Records
- Project scope stament
- Defined activities
- Network diagram
- Activity duration estimates
- Activity resource requirements
- Resource calendar
- Resource breakdown structure
- Identify working and not working days
- Risk that could impact de schedule
- The process include:
- Work with the stakeholders priorities
- look for alternative ways to complete the work
- look for the impact on others projects
- Negotiate resource
- apply leads and lags
- Compress the schedule: crashing, fast track, reestimate
- Adjust the component of project management plan
- example: risk plan or WBS
- scheduling tool
- optimize resource
- Approve final schedule
- Formal management approval
- Schedule Network Analysis
- Critical Phat Method
- Critical phat
- Is the longest path through the Network Diagram
- Is necesary determinate all paths to determinte the critical ptah
- Is the shortes time it could take to complete the project
- Is the longest path through the Network Diagram
- Allow focus the project management efforts
- helps to determinate if and issue need inmediat attención
- Allow the compress schedule
- show the float
- Near-Critical Path
- Is close, in duration, to critical path
- Increases the Risk
- There can be more that one
- Focus the time and effort monitoring and controlling activities on btoh the critical and near-critical paths
- Float or(=) slack
- Total float
- Amount of time an activity can be delayed without delaying the project end date or intermediary millestone.
- Free Float
- Amount of time an activity can be delayed without delaying the early start date of the its successor
- Project Float
- Amount of time a project can be delayed without delaying the externally imposed project competation date.
- Activities of Critical Path have 0 Slack
- IS an asset of the project
- Allow resource optimizing
- Allow share resource
- Float = Late Start - Aerly Start = Late Finish - Early Finish=Slack
- Total float
- Using CPM
- Fordware pass
- in convergence select the late aerly finish
- pass the EF to the successor
- pass from beginning to end project following the dependecies.
- Backware pass
- pass the ES to the predecessor
- In convergence select the aerly Late Start
- moving the end to benning of project following the dependencies.
- Activities with float=0 are in the critical path
- Fordware pass
- Critical phat
- Schedule compression
- Fast Tracking
- aTaking a critical path that were originally planning in a series and doing them instead in parallel
- Rework as a result
- increase the risk
- Requires more attention to comunication
- Crashing
- Adding or adjust resource
- Increase the cost
- Increase the risk
- Fast Tracking
- Modeling
- What if scenaries
- Resource Optimization
- Resource leveling
- Resource-Limited schedule
- availability and others constraint
- lengthens the schedule
- Increase the cost
- Is a function of software
- Resource-Limited schedule
- Resource Smootihng
- The resource is leveling only within the limits of floats of activities
- Resource leveling
- Critical Chain Method
- Monte Carlo Analysis
- Computer Software
- Base: Optimistic, pessimistic and most likely
- Result
- The probabllly of completing the project on any specific day
- The probabllly of completing for a any specific cost
- The probabllly of any activity actually being on the Critical Path
- the overall project risk
- Computer Software
- Critical Phat Method
- Approved Schedule Base line
Images and files in the map
Information
- Description
- Mind Map on TC#62#63_Optimization_Resource_Analysis_Diagram_Red, created by Paulino Valladar on 03/02/2016.
- Created by
- Paulino Valladar
- Views
- 3
- Rating