5e- Installation +/-

Gladys Mba IT A level, A2 English

Map content

5e- Installation +/-

  1. Direct (Plunge)

    • Advantages
      • O- Cheap to implement
      • O- No duplication of work
        • O- No loss of data integrity
      • O- Quick changeover
      • O- Systems don't need to been compatible
      • O- Can be down at off peak times e.g. bank holidays
    • Disadvantages
      • X- Any problems could cause system failure
        • No old system to go back to
      • X- Training for entire organisation has to be done in advance is everyone start the new system at once
        • X- Can take a long time for large organisation, meaning people may forget their training
  2. Parallel

    • Advantages
      • O- Can revert to old system if new system fails
      • O- New system's accuracy can be well compared to the old system
    • Disadvantages
      • X- Extra staff needed for duplicated data entry
        • X- Extra equipment and space may also be needed
      • X- Data integrity may be compromised
  3. Phased

    • Advantages
      • O- Lower risk of failure
        • O- Problem will only affect one part of the system and old system continues to work as usual
      • O- Errors can be identified by module and corrected with little effect
      • O- Training can take place one module at a time
    • Disadvantages
      • X- Can take long time
      • X- Have to wait and check module is working each time a new one is introduced.
      • X- Using two systems may confuse workers
        • X- Have to remembers which system to use for which task
      • X- Have to share data between both systems
        • X- Difficult if systems are incompatible
  4. Pilot

    • Advantages
      • O- Only one group of people affected by failure
      • O- Errors found in pilot stage can be corrected before going live
      • O- Can slowly add more people to new system to train over a long time
        • O- Pilot group can be used as trainers
    • Disadvantages
      • X- Can slow changeover process
      • X- Pilot group feel like guinea pigs having to work with error prone version
      • X- Compatibility issues may make task less efficient for pilot group

Information

Description
A level, A2 IT (Chapter 5) Mind Map on 5e- Installation +/-, created by Gladys Mba on 27/01/2017.