Slides|Lesson 2: Quality Management and Coordination
Slides in this set (9)
-
- Construction Documents
- Use group classification
- Height and area - limitations based on use group
- Construction Type - building materials used and fire resistance rating of the building elements
- Siting - location of building on the site, including distance from lot lines and adjacent buildings
- Fire performance
- Interior environment and design - compliance with special use and occupancy requirements, means of egress, accessibility, and interior environment requirements
- Exterior envelope - envelope requirements and energy conservation requirements
- Structural Performance - structural compliance and building material requirements
- Building service system
-
- Is there proper acccess to streets?
- Are building separations adequate according to fire code resistance ratings?
-
- Verify that ceilling hieghts are permissible. Check heights of habitable spaces below grade
- Verify that the height of the building is within allowable limits
- Verify that the floor area of each floor is within permissible limits
- Verify fire resistance of all building components
-
- Verify that openings are protected where they are exposed to property lines, adjacent buildings, interior courts, or other openings in the same wall, above and below
-
- Confirm the number of occupants anticipated to occupy each floor of a building.
- Verify the correct number, width, and arrangements of exits
- Verify that distances to exits are within allowable limits
- Verify that required exit door hardware is specified
- Confirm the adequacy of aisles, corridors, and horizontal exits
- Check that all stairways are properly located and enclosed, and that they provide a legal means of egress
-
- Verify that different occupancy types are separated by properly rated fire walls, etc
- Verify that elevator, escalator, and vertical shaft enclosures are properly fire rated
-
- Determine that finishes and trim meet requirements for proper classifications
- Installation methods must meet code equirements for control of smoke emission and limitations of smoke toxicity
-
- Verify that roof coverings have required ratings
Information
- Description
- Ballast Construction Documents and Services Lesson Two Study Guide
- Created by
- Molly Vaughan · Oct 2016
- Updated
- Oct 20, 2016
- Views
- 38
- Tags
- Rating