Quiz
CODE222
This quiz has question types that open in the usual player.
Questions in this quiz (23)
1List four requirements of an air barrier in order for it to perform as it is intended:
1. [blank_start]Continuity[blank_end]
2. [blank_start]Structural[blank_end] [blank_start]Integrity[blank_end]
3. [blank_start]Air[blank_end] [blank_start]impermeability[blank_end]
4. [blank_start]Durability[blank_end]- AContinuity
- BStructural
- CIntegrity
- DAir
- EImpermeability
- FDurability
2Because the component that performs the role of the [blank_start]air[blank_end] [blank_start]barrier[blank_end] changes from the wall to the window to the roof, [blank_start]continuity[blank_end] means that all these [blank_start]assemblies[blank_end] must be connected together so as to ensure that there is no break in the [blank_start]airtightness[blank_end] of the [blank_start]envelope[blank_end].
- Aair
- Bbarrier
- Ccontinuity
- Dairtightness
- Eenvelope
- FAVB
- Gstructural
- Hintegrity
- Iassemblies
3Select the answers that best describe the following:
An air barrier must be...- Acapable of resisting the imposed load or supported by one that can
- Bcapable of moving outside of the structural elements
- Ccapable of resisting wind load that is acting either as a pressure or suction
- Dcapable of resisting wind from the outside
- Ecapable of moving with the flow of air
- Fcapable of resisting the pressurization resulting from exhaust or stack effect
- Gcapable of holding the structural integrity of a building together
4What is the primary cause of building failures in Canada?
[blank_start]Air leakage[blank_end]- Aexcessive air leakage
5When should you consider air leakage as requiring special attention?
1. [blank_start]During the design stage[blank_end]
2. [blank_start]During construction[blank_end]- ADuring the design stage
- BDuring construction
6What approach initialized a change in construction practices in Canada?
[blank_start]Insulating on the outside[blank_end]- AInsulating on the outside
7Name the three types of roofing systems:
1. [blank_start]Conventional Roof System[blank_end] ([blank_start]CRS[blank_end])
2. [blank_start]Protected Membrane Roof System[blank_end] ([blank_start]PMRS[blank_end])
3. [blank_start]Modified Roof System[blank_end] ([blank_start]MRS[blank_end])- AConventional Roof System
- BCRS
- CProtected Membrane Roof System
- DPMRS
- EModified Roof System
- FMRS
8The roofing membrane in a conventional roof system is located:
- Abelow the thermal barrier
- Bbetween the thermal barrier
- Con top of the thermal barrier
- Dnear the thermal barrier
- Enear the drainage plane
- Fbehind the insulation
9In a protected membrane roof system, the thermal barrier:
- Ais on top of the roofing membrane
- Bis attached to the structure
- Chas holes in it to allow for ventilation
- Dis below the drainage plane
10In a modified roof system, the roofing membrane is [blank_start]between[blank_end] the [blank_start]thermal barriers[blank_end]
- Abetween
- Bthermal barriers
11Match the following terms with the appropriate definitions:
1. [blank_start]Gypsum Board on Roof Deck[blank_end]
- Used to provide a smooth surface (PMRS)
- Acts as a leveling layer for the AVB (CRS)
- Acts as a thermal barrier under combustible plastic insulations
2. [blank_start]Filter Fabric[blank_end]
- Helps keep loose laid insulation (PMRS) in respective position in case of "floating"
- Helps with UV Protection of insulation (PMRS) when not fully covered with ballast
3. [blank_start]Roof Deck[blank_end]
- Transfers the weight of live and dead loads to the supporting structure
- Serves as a base to which the roof membrane is attached
4. [blank_start]Insulation Overlay[blank_end]
- Protects from indentations due to roof traffic
- Fire retardant, reduces the chance of melting depressions and blister formation
- Reduces any problems associated with the dimensional instability and incompatibility of materials
- Can also act as a base sheet for some roofing membranes- AGypsum Board
- BPlaster Board
- CPolyurethane
- DBatt Insulation
- EFilter Fabric
- FRoof Deck
- GInsulation Overlay
- HInsulation Underlay
- IRoof Topping
- JConcrete Topping
12Name the four types of roofing membrane:
1. [blank_start]BUR[blank_end]
2. [blank_start]EPDM[blank_end]
3. [blank_start]PVC[blank_end]
4. [blank_start]Modified Bitumen[blank_end]- ABUR
- BEPDM
- CPVC
- DModified Bitumen
13Name the two types of insulation overlay:
1. [blank_start]Wood fibre board[blank_end]
2. [blank_start]Glass fibre board[blank_end]- AWood fibre board
- BGlass fibre board
14In protected membrane roof systems...
- Athe membrane provides the air barrier
- Bthe insulation is always vented
- Cballast covering isn't required
- Dnone of the above
15In torch-applied modified bitumous roofs, the [blank_start]insulation[blank_end] must be [blank_start]heat[blank_end] and [blank_start]fire[blank_end] resistant. less resistant materials can be overlaid with [blank_start]glass felt[blank_end] or [blank_start]mopped in place[blank_end].
- Ainsulation
- Bheat
- Cfire
- Dglass felt
- Emopped in place
16PMR systems offer good [blank_start]protection[blank_end] to the [blank_start]waterproofing[blank_end] [blank_start]membrane[blank_end] due to its location, but the [blank_start]membrane[blank_end] is not easily accessible for [blank_start]inspection[blank_end] or [blank_start]repair[blank_end].
- Aprotection
- Bwaterproofing
- Cmembrane
- Dmembrane
- Einspection
- Frepair
17In a ballasted roof, what can be installed to help prevent damage from roof traffic?
[blank_start]Walkways[blank_end]- AWalkways
18Match the advantages and disadvantages to the correct type of membrane:
Asphalt Built-Up Roofing
Advantages:
1. Long term [blank_start]history of performance[blank_end] (over 100 years)
2. [blank_start]20 year total roof system warranty[blank_end] available from materials manufacturer
3. [blank_start]Low to moderate[blank_end] initial installation cost
4. [blank_start]Good life cycle cost[blank_end]
5. [blank_start]Easily repaired[blank_end]
6. [blank_start]Maintainable[blank_end]
7. [blank_start]Multiple plies / redundancy[blank_end]
8. [blank_start]High abuse / puncture resistance[blank_end]
Disadvantages:
1. [blank_start]Moderate odor during installation[blank_end]
2. [blank_start]Moderate roof system weight[blank_end]
3. Must utilize a [blank_start]compatible underlayment / insulation[blank_end]
4. [blank_start]Sensitive to temperature extremes[blank_end] during installation
SBS Modified Bitumen
Advantages:
1. [blank_start]Decades of performance history[blank_end]
2. [blank_start]20 year total systems warranty[blank_end] available from manufacturer
3. [blank_start]Moderate initial installed cost[blank_end]
4. Good [blank_start]life cycle cost[blank_end]
5. [blank_start]Easily[blank_end] repaired
6. [blank_start]Maintainable[blank_end]
7. Roof system [blank_start]usually has multiple plies[blank_end]
8. High [blank_start]abuse / puncture resistance[blank_end]
Disadvantages:
1. Moderate [blank_start]asphalt odor[blank_end] during installation
2. Compatibile [blank_start]underlayment / insulation[blank_end] required
3. Sensitive to [blank_start]temperature extremes during installation[blank_end]
4. [blank_start]Intolerant to oil and grease[blank_end]- Ahistory of performance
- B20 year total roof system warranty
- CLow to moderate
- DFairly high
- EGood life cycle cost
- FEasily repaired
- GMaintainable
- HMultiple plies / redundancy
- IHigh abuse / puncture resistance
- JModerate odor during installation
- KModerate roof system weight
- Lcompatible underlayment / insulation
- MSensitive to temperature extremes
- NDecades of performance history
- O20 year total systems warranty
- PModerate initial installed cost
- Qlife cycle cost
- REasily
- SEasily Maintainable
- Tusually has multiple plies
- Uabuse / puncture resistance
- Vasphalt odor
- Wunderlayment / insulation
- Xtemperature extremes during installation
- YIntolerant to oil and grease
19Complete a 3 part detail as per the handout.
- AY
- BN
20Common causes of failure for building envelopes are:
- No [blank_start]air[blank_end] [blank_start]barrier[blank_end]
- Air barrier material not [blank_start]airtight[blank_end]
- Air barrier not [blank_start]flexible[blank_end] at [blank_start]joints[blank_end]
- Air barrier not [blank_start]well supported[blank_end]
- Air barrier not [blank_start]insulated[blank_end]
- [blank_start]Insulation[blank_end] not [blank_start]tight[blank_end] to [blank_start]air barrier[blank_end]
- [blank_start]Thermal[blank_end] [blank_start]bridging[blank_end]
- No [blank_start]air[blank_end] [blank_start]space[blank_end] behind [blank_start]cladding[blank_end]
- No [blank_start]positive[blank_end] [blank_start]cavity[blank_end] drainage
- [blank_start]Cladding[blank_end] improperly supported
- No allowance for [blank_start]creep[blank_end] and [blank_start]deflection[blank_end]
- [blank_start]Vapour[blank_end] [blank_start]barrier[blank_end] needed- Aairtight
- Bflexible
- Cjoints
- Dwell supported
- Einsulated
- FInsulation
- Gtight
- Hair barrier
- IThermal
- Jbridging
- Kair
- Lbarrier
- Mair
- Nspace
- Ocladding
- Ppositive
- Qcavity
- RCladding
- Screep
- Tdeflection
- UVapour
- Vbarrier
21The rules of a building envelope are:
[blank_start]Flex[blank_end]
[blank_start]Enclose[blank_end]
[blank_start]Insulate[blank_end]
[blank_start]Support[blank_end]
[blank_start]Tighten[blank_end]
[blank_start]Space[blank_end]
[blank_start]Drain[blank_end]
[blank_start]Protect[blank_end]
Feists Diploma- AFlex
- BEnclose
- CInsulate
- DSupport
- ETighten
- FSpace
- GDrain
- HProtect
22List the Principal Requirements of a wall:
Control [blank_start]heat[blank_end] [blank_start]flow[blank_end]
Control [blank_start]air[blank_end] [blank_start]flow[blank_end]
Control [blank_start]water[blank_end] [blank_start]vapour[blank_end] [blank_start]flow[blank_end]
Control [blank_start]rain[blank_end] [blank_start]penetration[blank_end]
Control [blank_start]light[blank_end], [blank_start]solar[blank_end] and other [blank_start]radiation[blank_end]
Control [blank_start]noise[blank_end]
Control [blank_start]fire[blank_end]
Provide [blank_start]strength[blank_end] and [blank_start]rigidity[blank_end]
Be [blank_start]durable[blank_end]
Be [blank_start]aesthetically[blank_end] [blank_start]pleasing[blank_end]
Be [blank_start]economical[blank_end]- Aheat
- Bflow
- Cair
- Dflow
- Ewater
- Fvapour
- Gflow
- Hrain
- Ipenetration
- Jlight
- Ksolar
- Lradiation
- Mnoise
- Nfire
- Ostrength
- Prigidity
- Qdurable
- Raesthetically
- Seconomical
- Tpleasing
23The principal function of the [blank_start]air barrier[blank_end] is to prevent both the [blank_start]infiltration[blank_end] of outdoor air into a building and the [blank_start]exfiltration[blank_end] of indoor air to the outside.
- Aair barrier
- Binfiltration
- Cexfiltration
- Dexhaust
- Evapour barrier
Information
- Description
- SEC III Architecture Quiz on CODE222, created by Karson Smith on 23/11/2016.