Quiz
PMP
This quiz has a time limit, so it opens in the usual player.
Questions in this quiz (90)
1Four project managers are having lunch together and discussing their projects. Most of the time they are just complaining about how hard projects are to manage in their company. Some complain about the stakeholders and the number of changes they cause. Others talk about how hard it is to get people to cooperate and perform. One project manager wants to focus on the advantages of the matrix-type organization they all work in for their projects. Which of the following would he mention?
- AImproved project manager control over resources
- BMore than one boss for project teams
- CCommunications are easier
- DReporting is easier
2Two project managers have just realized that they are in a weak matrix organization and that their power as project managers is quite limited. One figures out that he is really a project expediter and the other realizes he is really a project coordinator. How is a project expediter different from a project coordinator?
- AThe project expediter cannot make decisions
- BThe project expediter can make more decisions
- CThe project expediter reports to a higher-level manager
- DThe project expediter has some authority
3In a projectized organization, the project team?
- AReports to many bosses
- BHas no loyalty to the project
- CReports to the functional manager
- DWill not always have a home
4A project manager is trying to complete a software development project, but cannot get enough attention for the project. Resources are focused on completing process-related work and the project manager has little authority to properly assign resources. What form of organization must the project manager be working in?
- AFunctional
- BMatrix
- CExpediter
- DCoordinator
5A project manager has very little project experience, but he has been assigned as the project manager of a new project. Because he will be working in a matrix organization to complete his project, he can expect communications to be
- ASimple
- BOpen and accurate
- CComplex
- DHard to automate
6A project team member is talking to another team member and complaining that many people are asking him to do things. If he works in a functional organization, who has the power to give direction to the team member?
- AThe project manager
- BThe functional manager
- CThe team
- DTight matrix
7Who has the MOST power in a projectized organization?
- AThe project manager
- BThe functional manager
- CThe team
- DThey all share power
8All of the following are characteristics of a project EXCEPT:
- ATemporary
- BDefinite beginning and end
- CInterrelated activities
- DRepeats itself every month
9All of the following are parts of the team's stakeholder management effort EXCEPT:
- AGiving stakeholders extras
- BIdentifying stakeholders
- CDetermining stakeholders' needs
- DManaging stakeholders' expectations
10A manager and the head of engineering discuss a change to a major work package. After the meeting, the manager contacts you and tells you to complete the paperwork to make the change. This is an example of:
- AManagement attention to scope management
- BManagement planning
- CA project expediter position
- DA change control system
11The project is in the planning process group when three stakeholders come to the project manager asking for information on the company's new project management methodology. They want to know where it came from and why it is different from the way they currently manage projects. These stakeholders are also friends of the project manager, and the entire group has worked together for years. The project is using some new terms like corrective action that are making some stakeholders nervous, as they are unsure whether the way projects will be managed is going to change along with new terms. What should the project manager do?
- AAdvise the stakeholders that she will keep them in the communication loop for the project
- BSupply a list of new terms and their definitions
- CNotify the project management office (PMO)
- DMake sure she maintains her authority as the project manager even though the stakeholders are her friends
12A project manager is managing his second project. It started one month after the first and both are ongoing. Though his first project is small, this one seems to be growing in size every day. As each day passes, the project manager is beginning to feel more and more in need of help. The project manager has recently heard that there was another project in the company last year that is similar to his second project. What should he do?
- AContact the other project manager and ask for assistance
- BObtain historical records and guidance from the project management office (PMO)
- CWait to see if the project is impacted by the growth in scope
- DMake sure the scope for the project is agreed to by all the stakeholders.
13The project life cycle differs from the product life cycle in that the project life cycle:
- ADoes not incorporate a methodology
- BIs different for each industry
- CCan spawn many projects
- DDescribes project management activities
14Management by objectives works only if:
- AIt is supported by management
- BThe rules are written down
- CThe project does not impact the objectives
- DThe project includes the objectives in the project charter
15Your management has decided that all orders will be treated as projects and that project managers will be used to update orders daily, to resolve issues, and to ensure that the customer formally accepts the product within 30 days of completion. Revenue from the individual orders can vary from US $100 to US $150,000. The project manager will not be required to perform planning or provide documentation other than daily status. How would you define this situation?
- ABecause each individual order is a temporary endeavor:' each order is a project
- BThis is program management since there are multiple projects involved
- CThis is a recurring process
- DOrders incurring revenue over $100,000 would be considered projects and would involve project management
16The previous project manager for your project managed it without much project organization. There is a lack of management control and no clearly defined project deliverables. Which of the following would be the BEST choice for getting your project better organized?
- AAdopt a life cycle approach to the project
- BDevelop lessons learned for each phase
- CDevelop specific work plans for each work package
- DDevelop a description of the product of the project
17A project team is working on manufacturing a new product, but they are having difficulty creating a project charter. What is the BEST description of the real problem?
- AThey have not identified the project objectives
- BThey are working on a process and not a project
- CThe end date has not been set
- DThey have not identified the product of the project
18One of your team members informs you that he does not know which of the many projects he is working on is the most important. Who should determine the priorities among projects in a company?
- AThe project manager
- BThe project management team
- CThe project management office
- DThe team
19A market demand, a business need, and/or legal requirement are examples of:
- AReasons to hire a project manager
- BReasons projects are initiated
- CReasons people or businesses become stakeholders
- DReasons to sponsor a project
20Operational work is different from project work in that it is:
- AUnique
- BTemporary
- COn-going and repetitive.
- DA part of every project activity.
21Company procedures require the creation of a lessons learned document. Which of the following is the BEST use of lessons learned?
- AHistorical records for future projects
- BPlanning record for the current project
- CInforming the team about what the project manager has done
- DInforming the team about the project management plan
22Lessons learned are BEST completed by:
- AThe project manager.
- BThe team.
- CThe sponsor.
- DThe stakeholders.
23Consideration of ongoing operations and maintenance is crucially important to products of projects. Ongoing operations and maintenance should:
- ABe included as activities to be performed during project closure
- BHave a separate phase in the project life cycle, because a large portion of life cycle costs is devoted to maintenance and operations.
- CNot be viewed as part of a project. A project is temporary with a definite beginning and end.
- DBe viewed as a separate project.
24What is a program?
- AAn initiative set up by management
- BA means to gain benefits and control of related projects
- CA group of unrelated projects managed in a coordinated way
- DA government regulation
25A company is making an effort to improve its project performance and create historical records of past projects. What is the BEST way to accomplish this?
- ACreate project management plans
- BCreate lessons learned
- CCreate network diagrams
- DCreate status reports
26In which project management process group is the detailed project budget created?
- AInitiating
- BBefore the project management process
- CPlanning
- DExecuting
27The project charter is created in which project management process group?
- AExecuting
- BPlanning
- CClosing
- DInitiating
28The project team has just completed the initial project schedule and budget. The NEXT thing to do is:
- AIdentify risks
- BBegin iterations
- CDetermine communications requirements
- DCreate a bar (Gantt) chart.
29A detailed project schedule can be created only after creating the:
- AProject budget
- BWork breakdown structure
- CProject management plan
- DDetailed risk assessment
30The person who should be in control of the project during project planning is the:
- AProject manager
- BTeam member
- CFunctional manager
- DSponsor.
31The high-level project schedule constraints have just been determined. What project management process group are you in?
- AInitiating
- BPlanning
- CExecuting
- DMonitoring and controlling
32A project manager does not have much time to spend planning before the mandatory start date arrives. He therefore wants to move through planning as effectively as possible. Which of the following would you recommend?
- AMake sure you have a signed project charter and then start the WBS
- BCreate an activity list before creating a network diagram
- CDocument all the known risks before you document the high-level assumptions
- DFinalize the quality management plan before you determine quality metrics
33The BEST time to assign a project manager to a project is during:
- AExecuting
- BClosing
- CInitiating
- DPlanning
34A project manager gets a call from a team member notifying him that there is a variance between the speed of a system on the project and the desired or planned speed. The project manager is surprised because that performance measurement was not identified in planning. If the project manager then evaluates whether the variance warrants a response, he is in what project management process?
- AInitiating
- BExecuting
- CMonitoring and controlling
- DClosing
35A team member notifies the project manager that the activities comprising a work package are no longer appropriate. It would be BEST for the project manager to be in what part of the project management process?
- ACorrective action
- BIntegrated change control
- CMonitoring and controlling
- DProject closing
36During a team meeting, a team member asks about the measurements that will be used on the project to judge performance. The team member feels that some of the measures related to activities assigned to him are not valid measurements. The project is BEST considered in what part of the project management process?
- AClosing
- BMonitoring and controlling
- CExecuting
- DInitiating
37Which of the following would be the MOST appropriate thing to do during the initiating process group?
- ACreate a detailed description of the project deliverables
- BGet familiar with the company culture and structure as it relates to the project
- CIdentify the root cause of problems
- DEnsure all project management processes are complete
38Which of the following is a characteristic of project management processes?
- AIterative
- BUnique
- CUnnecessary
- DStandardized
39Which project management process group normally takes the MOST project time and resources?
- APlanning
- BDesign
- CIntegration
- DExecuting
40All of the following must be performed during project initiating EXCEPT:
- AIdentify and document business needs
- BCreate a project scope statement
- CDivide large projects into phases
- DAccumulate and evaluate historical information
41Closure includes all of the following EXCEPT:
- ADetermining performance measures
- BTurning over the product of the project
- CDocumenting the degree to which each project phase was properly closed after its completion
- DUpdating the company's organizational assets
42The work on the first phase of your project has come to an end. What should you ensure is done BEFORE beginning the next phase?
- AVerify that the resources are available for the next phase
- BCheck the project's progress compared to its baselines
- CConfirm that the phase has reached its objectives, and have its deliverables formally accepted
- DRecommend corrective action to bring the project results in line with project expectations
43In which process group does the team measure and analyze the work being done on the project?
- AInitiating
- BExecuting
- CMonitoring and controlling
- DClosing
44Which process groups must be included in every project?
- APlanning, executing, and closing
- BInitiating, planning, and executing
- CInitiating, planning, executing, monitoring and controlling, and closing
- DPlanning, executing, and monitoring and controlling
45Control Schedule, Report Performance, and Administer Procurements are parts of which process group?
- AInitiating
- BPlanning
- CExecuting
- DMonitoring and controlling
46Which process group focuses on completing the requirements of the project?
- AInitiating
- BPlanning
- CExecuting
- DClosing
47All of the following occur during the planning process group EXCEPT:
- ADevelop Project Charter
- BCreate WBS
- CEstimate Costs
- DSequence Activities
48The project kick-off meeting should ideally occur when?
- AAfter the project scope statement is completed
- BOnce the scope management plan is approved
- CBefore you begin creating the WBS
- DAfter the project charter is signed
49In which of the following structures can managers plan and evaluate project implementation but not have any actual authority over the workers?
- ATraceability matrix
- BStrong matrix
- CCoverage matrix
- DWeak matrix
50Which of the following is a time-phased budget that is used to measure and monitor cost performance throughout the project life cycle?
- ACost estimating
- BCost variance
- CChange control
- DCost baseline
51The ongoing definition of a project as more information becomes available to the team is called:
- AStrategic planning
- BProgressive elaboration
- CScope validation
- DQuantitative elaboration
52Four project managers are having lunch together and discussing their projects. Most of the time they are just complaining about how hard projects are to manage in their company. Some complain about the stakeholders and the number of changes they cause. Others talk about how hard it is to get people to cooperate and perform. One project manager wants to focus on the advantages of the matrix-type organization they all work in for their projects. Which of the following would he mention?
- AMore than one boss for project teams
- BCommunications are easier
- CImproved project manager control over resources
- DReporting is easier
53The high-level project schedule constraints have just been determined. What project management process group are you in?
- AInitiating
- BMonitoring and controlling
- CExecuting
- DPlanning
54A project manager receives a change request from the customer. The change requires adding a new filtration system to the project in place of a cleaner bag. When the project manager evaluates the change, it is MOST important that she consider the impact on the:
- ASubsequent work packages
- BCommunications management plan
- CAll Project aspects
- DSponsor
55Which project management process group generally takes the MOST project time and resources?
- AIntegration
- BDesign
- CPlanning
- DExecuting
56Which of the following is the MOST appropriate thing to do in project closing?
- AWork with the customer to determine acceptance criteria
- BCollect historical information from previous projects
- CConfirm all the requirements in the project have been met
- DGain formal approval of the management plans.
57Which of the following is NOT a Project Management Knowledge Area? A. B. C. D.
- AProject Integration Management
- BProject Procurement Management
- CProject Configuration Management
- DProject Communications Management
58The project charter is created in which project management process group?
- APlanning
- BInitiating
- CExecuting
- DClosing
59Project management can be thought of as a start-_______-do-check-act cycle.
- AControl
- BExecute
- CInitiate
- DPlan
60All of the following must be performed during project initiating EXCEPT:
- ADivide a large project into phases
- BAccumulate and evaluate historical information
- CIdentify and document business needs
- DCreate a project scope statement.
61In which process group does authorization to start a new phase of the project occur?
- AInitiating
- BPlanning
- CMonitoring and controlling
- DClosing
62In which process group does Close Procurements occur?
- AClosing
- BMonitoring and controlling
- CInitiating
- DPlanning
63To complete the project initiating processes, a project manager needs the project charter and:
- AA scope management plan
- BA project scope statement
- CThe stakeholder register
- DA work breakdown structure
64Which of the following is the MOST appropriate thing to do in the monitoring and controlling process group?
- AImplement recognition and reward systems
- BObtain sign-off of the product of the project
- CKeep everyone focused on completing the project to the charter
- DCreate work performance reports.
65A project manager gets a call from a team member notifying him that there is a variance between the speed of a system on the project and the desired or planned speed. The project manager is surprised because that performance measurement was not identified in planning. If the project manager then evaluates whether the variance warrants a response, he is in which part of the project management process?
- AMonitoring and controlling
- BClosing
- CExecuting
- DInitiating
66A project manager measures the project against the project management plan to determine if the project is in control. Which of the following is also done in project monitoring and controlling?
- AValidate scope
- BManage communications
- CImplement quality assurance procedures
- DContinuous improvement
67Which of the following BEST describes formal acceptance of a project?
- AFinal payment is made
- BFinal deliverables are sent to the customer
- CSubstantial completion is reached
- DCustomer sign-off of the product is documented
68Which of the following is the MOST appropriate thing to do in the planning process group?
- AHold a meeting of all parties to make certain everyone is familiar with the details of the project
- BPerform Quality Assurance
- CImplement approved process improvements
- DDetermine high-level stakeholders
69Lessons learned are BEST gathered from:
- AThe team
- BThe project manager
- CThe sponsor
- DThe stakeholders.
70Which of the following BEST describes the project manager's role during project planning?
- ACreating a bar chart and getting management to approve it
- BDetermining what can get in the way and how to prevent it
- CMaking a list of activities the team members are required to perform
- DManaging the creation of a document that can be used to guide the project
71 While the project is being completed, management requests a change. What is the FIRST thing the project manager should do?
- ATell the customer that a change will be coming
- BComply with the request if possible.
- CAsk the team to accept the change
- DObtain an understanding of the scope of the change.
72All of the following are purposes of the project charter EXCEPT:
- AIt gives the project manager authority
- BIt identifies the project acceptance criteria
- CIt identifies high-level risks and constraints
- DIt establishes the project
73In your project, you are in the process of leading and performing the work defined in the project management plan and implementing approved changes to achieve the project`s objectives. This is done during:
- ADirect and Manage Project Work
- BDevelop Project Management Plan
- CMonitor and Control Project Work
- DCreate Deliverables
74You are preparing a document using project statement of work, business case, agreements, enterprise environmental factors, and organizational process assets. These are valid inputs for:
- ADevelop Project Management Plan
- BDirect and Manage Project Work
- CDevelop Project Charter
- DPerform Integrated Change Control
75You are the project manager of a pharmaceutical company responsible for releasing a new drug in the market. While managing the project, you have created several documents (e.g., project management plan; risk registers and other registers; project calendars; change management documentation; etc.). All these documents should be stored in:
- AHistorical information
- BProject documents
- CProject or phase closure documents
- DConfiguration management system
76The director (information systems) in your company is in the process of creating a project charter to formally authorize a new project in your company. In this context, what should be done FIRST?
- ADevelop Project Management Plan
- BAssign a project manager for the project
- CAcquire Project Team
- DIntegrate the work of the project with the ongoing operations of the performing organization
77Which of the following is part of the integration management process?
- ADefine Activities
- BMonitor and Control Project Work
- CCreate WBS
- DManage Stakeholder Engagement
78What is the benefit of the closing process if the project has been terminated?
- AThe benefit of the closing process is to document how much work the project manager did.
- BThe benefit of the closing process is to gather lessons learned for the benefit of future projects.
- CThere is no benefit to closing a project if the project has been terminated.
- DThe benefit of the closing process is to get everyone together and acknowledge that the team did a good job, even though the project was terminated.
79Adhering to legal requirements, satisfying competing needs, providing accurate and truthful representations, and disclosing conflicts of interest are all:
- AExamples of the professional and social responsibility of the project manager.
- BExamples of scope management.
- CExamples of the intellectual property requirements of subcontractors.
- DExamples of project closure activities.
80Which of the following BEST describes the project manager's role regarding project changes?
- APrevent the addition of profit in sellers' changes.
- BDiscover changes as early as possible.
- CHave the sponsor approve all changes.
- DPrevent changes that affect the project scope.
81A software development project has been suffering through many major project changes. Because of this, the project manager has not been able to do much but complete change request forms. Which statement BEST describes the other activities the project manager should be doing?
- ADetermine that a change has occurred. Notify all stakeholders affected by the change, and list all the changes in the scope management plan.
- BList all changes in the project charter, notify stakeholders affected by changes, and ensure the team signs off on all changes.
- CDetermine that changes have been made and whether the changes are beneficial. List all of them in the scope management plan.
- DDetermine if a change is needed. Determine whether that change is beneficial, and notify stakeholders affected by the change.
82During the creation of lessons learned for a project, the team determines that the project would have been better if they had a change control board. Which of the following is the BEST description of what a change control board helps the team to do?
- ACreate procedures
- BFormulate the change
- CApprove or reject changes
- DCreate change requests
83Who issues the project charter?
- AProject team
- BSponsor
- CProject manager
- DStakeholders
84Which of the following is included in a project charter?
- ADetailed resource estimates
- BThe business case for the project
- CWork package estimates
- DA risk management strategy
85You are a project manager in a large organization that uses a matrix
structure. You have been asked to investigate what organizational structures
your competitors use and how the choices affect their ability to manage projects
successfully. Which type of organizational structure gives the LEAST amount of
authority to project managers?- AFunctional
- BProfit centers
- CMatrix
- DProjectized
86Consideration of ongoing operations and maintenance is crucially
important to products of projects.
Ongoing operations and maintenance should:- ANot be viewed as part of a project.
- BBe viewed as a separate project.
- CHave a separate phase in the project life cycle, because a large portion
of life cycle costs is devoted to maintenance and operations. - DBe included as activities to be performed during project closure.
87In a projectized organization, the project team:
- AReports to many bosses.
- BHas no loyalty to the project.
- CReports to the functional manager.
- DWill not always have a "home."
88You are working in the Project Management Office (PMO) of your
organization. Your job responsibility is to:- AManage the operational activities in the company
- BManage human resource and risk management issues for individual
projects - CProvide support functions to project managers in the form of training,
providing software,standardizing policies, etc. - DProvide subject matter expertise in the functional areas of the project
89An organization is going through an evolutionary phase of restructuring
the way it does projects. In a shift from a weak matrix organization to a strong
matrix organization, the power is shifted from the:- AProject manager to the functional manager.
- BFunctional manager to the project manager.
- CFunctional manager to the sponsor.
- DExpediter to the coordinator.
90Which of the following is a characteristic of project management
processes?- AUnique
- BUnnecessary
- CRepeated
- DStandardized
Information
- Description
- Project Management Quiz on PMP, created by abdulaziz zaid on 22/11/2017.
- Author
- abdulaziz zaid
- Language
- English
- Views
- 1,274
- Tags
- Rating
- 5.0 out of 5 · 1 rating Rate this quiz
More on Project Organizations and PMOs