Project Planning/Scheduling Mid-Term Practice

Tyler Warford 50 questions 5.0 (1 rating)

Take the quiz

Questions in this quiz (50)

  1. 1what is the difference between a task and an activity
    1. Anothing, they are the same thing.
    2. Ba task has a duration of less than 5 days an activity has a duration of 5 days or more
  2. 2what the most important resource in LEAN construction?
    1. AWaste of Talent
    2. BTransportation
    3. CInventory
    4. DWaiting
  3. 3What does "Transportation" waste in TIMWOOD+U primarily refer to?
    1. AUnnecessary production steps
    2. BExcessive movement of materials leading to potential damage
    3. CWaiting time for materials to arrive
    4. DMistakes in construction
  4. 4Why is excess "Inventory" considered a form of waste?
    1. AIt takes up space and can result in damaged materials and inefficient capital allocation
    2. BIt promotes efficient allocation of capital
    3. CIt leads to unnecessary movement of materials
    4. DIt minimizes waiting time for materials
  5. 5What does waste in "Motion" refer to in the context of TIMWOOD+U?
    1. AUnnecessary movements of materials that don't add value
    2. BProduction of unneeded materials
    3. CWaiting for material delivery
    4. DErrors in construction
  6. 6Which form of waste is typically associated with subcontractors (subs)?
    1. AOver-Processing
    2. BOver-Production
    3. CDefects
    4. DInventory
  7. 7What is the consequence of "Wasted Human Potential" in lean construction?
    1. AEfficient work on the jobsite
    2. BWorkers not operating effectively on the jobsite
    3. CReduction in the unnecessary steps in production
    4. DElimination of waiting time for materials
  8. 8Mapping the value chain in Lean Construction refers to the process of making a visual representation of every step from the beginning to the end of a construction project.
    1. ATrue
    2. BFalse
  9. 9In the “Create Flow” principle, it's advisable to move large batches through the construction process to increase efficiency.
    1. ATrue
    2. BFalse
  10. 10The “Pull” work principle of Lean Construction encourages pushing activities through a project to ensure timely completion.
    1. ATrue
    2. BFalse

Information

Description
Management Construction Quiz on Project Planning/Scheduling Mid-Term Practice, created by Tyler Warford on 03/10/2023.
Language
English
Views
45
Rating
5.0 out of 5 · 1 rating
Rate this quiz
Rate this quiz

Feedback

What is it about?

What do you think of the new look?

How do you like it?