¡GoConqr estrena diseño! Cuéntanos qué te parece.

Diagrama de flujo

ENG1100

Ray Dew Engineering Year 10 Inglés

Contenido del diagrama

  1. Goal: Create a prototype of a Flood Resistance Community Centre

  2. 2.0 Structure Subsystem

  3. 3.0 Drive System

  4. 1.0 Control and Power Subsystem

  5. 1.1 Analyse pros, cons and characteristics of existing Solutions of Control and Power systems (Min 3)

  6. 1.2 Create initial design sketches of the power and control subsystems based on info from 1.1 (Min 3)

  7. 1.3 Finalise Initial design and begin procuring materials

  8. 1.5 Implement final power and control elements with the other subsystems

  9. 1.4 Assemble, Separately test and tweak Initial Power and Control Elements

  10. 1.6 Evaluate the control and power system in the scope of the entire prototype and provide any relevant criticism and recommendations

  11. 2.1 Analyse pros, cons and characteristics of Existing Solutions of the Structure systems (Min 3)

  12. 2.2 Create initial design sketches of the Structure systems based on info from 2.1 (Min 3)

  13. 2.3 Finalise Initial design and begin procuring materials

  14. 2.5 Implement final structural subsystem with the other subsystems

  15. 2.4 Assemble, Separately test and tweak Initial structural Elements

  16. 2.6 Evaluate the structural sub system in the scope of the entire prototype and provide any relevant criticism and recommendations

  17. 3.1Analyse pros, cons and characteristics of Existing Solutions of drive systems (Min 3)

  18. 3.2 Create initial design sketches of the drive subsystems based on info from 3.1 (Min 3)

  19. 3.3 Finalise Initial design and begin procuring materials

  20. 3.5 Implement final Drive system with the other subsystems

  21. 3.4 Assemble, Separately test and tweak Initial Drive system

  22. 3.6 Evaluate the drive system in the scope of the entire prototype and provide any relevant criticism and recommendations

  23. 0.0 Planning

  24. 0.1 Determining the Project Constraints (Budget, Desgin and etc.) for the entire system

  25. 0.2 Determining and creating a gantt chart of the project

  26. 0.3 Determining and splitting the tasks and roles amongst group members

  27. 0.1.1 Create a document containing Budgetary and Design Constraints and the project scope

  28. 0.1.2 Determine assumptions of the project based on project scope and project constraints

  29. 0.2.1 Determine the task needed for the Gantt Chart (Based on work breakdown list)

  30. 0.2.2 Agree upon and designate the timeframes for all the listed tasks

  31. 0.3.1 Assign Group members to the subsystems based on skills and interest

  32. 0.3.2 Assign group members to relevant roles based on skills and interest

  33. 1.3.1Create a detailed 2D sketch of the final designs with approximated Dimensions

  34. 1.3.2 Create a 3D model of the final design with dimensions, simulation of the subsystem and relevant details

  35. 1.3.3 Create a list of possible materials (based on allocated budget) and start procurement

  36. 1.4.1 Assemble Prototype based on the final design specifications utilising procured materials

  37. 1.4.2 Test the Prototype, ensure that the power system work properly is safe and ensure that the control subsystem is responsive and can work in tandem with the drive system

  38. 1.4.3 Modify the Prototype based on an observed faults or possible improvements based on testing from 1.4.2

  39. 2.3.1 Create a detailed 2D sketch of the final designs with approximated Dimensions

  40. 2.3.2 Create a 3D model of the final design with dimensions, wind tunnel simulations and relevant details (including functional doors and windows)

  41. 2.3.3 Create a list of possible materials (based on allocated budget) and start procurement

  42. 3.3.1Create a detailed 2D sketch of the final designs with approximated Dimensions

  43. 3.3.2 Create a 3D model of the final design with movement animation, dimensions and relevant details

  44. 3.3.3 Create a list of possible materials (based on allocated budget) and start procurement

  45. 1.4.1 Assemble Prototype based on the final design specifications utilising procured materials

  46. 1.4.2 Test the Prototype, ensure that the prototype is water-tight in the relevant areas, is secure/resilient enough to mount the other subsystems

  47. 1.4.3 Modify the Prototype based on an observed faults or possible improvements based on testing from 1.4.2

  48. 1.4.1 Assemble Prototype based on the final design specifications utilising procured materials

  49. 1.4.2 Test the Prototype, ensure that the drive system performs underwaters properly and is safe to use and ensure and can work in tandem with the control and power system

  50. 1.4.3 Modify the Prototype based on an observed faults or possible improvements based on testing from 1.4.2

Información

Descripción
Year 10 Engineering Diagrama sobre ENG1100, creado por Ray Dew el 26/02/2024.
Creado por
Ray Dew
Visitas
1
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?