¡GoConqr estrena diseño! Cuéntanos qué te parece.

Mapa mental

Before work starts

Sivakarunan G Construction - Inglés

Contenido del mapa

Before work starts

  1. Accounts

    • Bill book, vouchers etc....
  2. Electrical line

    • Apply for 3 phase based on site requirement
    • Purchasing wire to achieve different usage
      • protect wire from shock
  3. Plumbing

    • Bore or well
  4. Labours

    • Full time labours required
    • Labour shed
  5. Plant and machinary

    • Mixer machine
      • prepare cover for lever at sides to protect from labours while working
    • steel or plastic bucket
    • wooden 1.25cft box
  6. Employees

    • Engineers required relating the Jon we do
    • Engineers shed
    • smart phone with few app
  7. Management

  8. Tools

    • storage shed
    • Wood / bricks to stack the materials
  9. Estimation

    • Quantity req to purchase till plinth level
      • Gravel
      • sand / m-sand
      • cement
      • Bricks / Blocks
      • Blue metal

Información

Descripción
- (Construction) Construction Mapa Mental sobre Before work starts, creado por Sivakarunan G el 14/10/2016.
Creado por
Sivakarunan G
Visitas
0
Etiquetas
before work starts
Valoración

Más sobre Construction Planning and Stages

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?