GoConqr has a new look! Let us know what you think.

Mind map

Before work starts

Sivakarunan G Construction - English

Map content

Before work starts

  1. Accounts

    • Bill book, vouchers etc....
  2. Electrical line

    • Apply for 3 phase based on site requirement
    • Purchasing wire to achieve different usage
      • protect wire from shock
  3. Plumbing

    • Bore or well
  4. Labours

    • Full time labours required
    • Labour shed
  5. Plant and machinary

    • Mixer machine
      • prepare cover for lever at sides to protect from labours while working
    • steel or plastic bucket
    • wooden 1.25cft box
  6. Employees

    • Engineers required relating the Jon we do
    • Engineers shed
    • smart phone with few app
  7. Management

  8. Tools

    • storage shed
    • Wood / bricks to stack the materials
  9. Estimation

    • Quantity req to purchase till plinth level
      • Gravel
      • sand / m-sand
      • cement
      • Bricks / Blocks
      • Blue metal

Information

Description
- Construction (Construction) Mind Map on Before work starts, created by Sivakarunan G on 14/10/2016.
Created by
Sivakarunan G
Views
0
Tags
before work starts
Rating

More on Construction Planning and Stages

Feedback

What is it about?

What do you think of the new look?

How do you like it?