¡GoConqr estrena diseño! Cuéntanos qué te parece.

Test

CHL Chapter 18 Quiz

william Hoover 10 preguntas

Hacer el test

Preguntas del test (10)

  1. 1A request made to prospective architects,contractors/builders, suppliers, or others to learn the price of a product or service
    1. ARequest for Proposal
    2. BBid Request
    3. CConstruction Estimate
    4. DContractor Statement
  2. 2An individual or business that signs a contract to perform part of the project that is the responsibility of the contractor
    1. AInternal Contractor
    2. BSecondary Contractor
    3. CBack-Up Contractor
    4. DSub Contractor
  3. 3A multi-disciplinary process that focus's on reducing risk from infection throughout planning, design, and construction (including renovation) activities undertaken by a healthcare facility
    1. AFailure Mode Effect Analysis (FMEA)
    2. BInfection Control Risk Assessment (ICRA)
    3. CRequested Proposal Plan (RPP)
    4. DConstruction Proposal Plan (CSP)
  4. 4The cost to acquire or make improvements to a long-term asset such as a building, property, or equipment
    1. AGeneral Fund Acquisition
    2. BGeneral Fund Expenditure
    3. CCapital Expenditure
    4. DCapital Acquisition
  5. 5An unlicensed person who typically plans changes that do not relate to regulatory (building code) requirements
    1. ADesigner
    2. BArchitect
    3. CDraftsman
    4. DContractor
  6. 6A licensed professional who focuses on the aesthetic design of buildings and spaces, structures, mechanical systems, acoustics, regulatory, and other requirements needed to make buildings useful and safe for their occupancy
    1. ADraftsman
    2. BArchitect
    3. CDesigner
    4. DContractor
  7. 7The act of purchasing a product or service from an external provider that could alternatively be provided by the facilities own employees
    1. APRN Contract
    2. BSub-Contract
    3. CRental
    4. DOutsource
  8. 8A revision to a construction purchase order issued by a buyer to a contractor or service provider
    1. ARequest for Revision
    2. BChange Order
    3. CContractor Revision
    4. DDesigner Change
  9. 9An initial step in project planning is to form a ______ that includes physicians, care givers, central service leaders, department managers, technicians, and infection prevention specialists
    1. AStrategic Project Planning Team
    2. BInfection Control Team
    3. CPatient Protection Team
    4. DEnvironmental Audit Team
  10. 10A study that considers safety concerns applicable to the environment, employees, and community
    1. AFeasibility Study
    2. BPatient Impact Study
    3. CEnvironmental Impact Study
    4. DInfection Control and Waste Impact Study

Información

Descripción
Iahcsmm (CHL Exam) Sterile Processing Test sobre CHL Chapter 18 Quiz, creado por william Hoover el 10/05/2017.
Idioma
English
Visitas
304
Valoración
Aún sin valoraciones
Valora este test
Valora este test

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?