  1. 1Name the different types of changeover.-Direct
    -Parallel
    -Pilot
    -Phased
  2. 2What is Direct Changeover?Changing the system from the old to the new one in one operation.
    It is the quickest method, however it is stressful and has no backup if anything goes wrong.
  3. 3What is Parallel Changeover (Parallel running)?This is when the old system remains in operation as the new system is being implemented.
    It requires all work to be done twice, therefore increasing time and costs.
    It is a safer method as there will be a backup in case something goes wrong.
    The old system is eventually phased out.
  4. 4What is Pilot Changeover?Where one of the branches/departments tries out the new system.
  5. 5What is Phased Changeover (Phased Implementation)?Where sections are implemented and phased into operation until the whole system is operational.

Information

Description
A2 ICT Flashcards on Methods of Changeover, created by lisajoshua5 on 10/06/2014.
Created by
lisajoshua5
Views
13
Rating

More on System Implementation and Changeover

Feedback

What is it about?

What should we add next?