GoConqr has a new look! Let us know what you think.

Mind map

Bored Piles Construction

mdunn7200 Quantity Surveying Fourth Year English

Map content

Bored Piles Construction

  1. Size can be varied

    • Suits different ground conditions
    • Allows for stronger foundations
  2. High cost (compared to driven piles)

    • More material needed
    • More wastage to get rid of
  3. Defects can occur during construction

    • Cracking leads to weaker pile strength
    • Costly to Replace
  4. Suitable for Urban Conctruction

    • Lower noise - less effect on surrounding buildings
    • Less vibration - less effect on surrounding buildings
  5. Construction can be completed quickly

    • Machinery is mobile and can be moved quickly to bore holes
      • More holes can then be poured at a time.
  6. Soil can be tested before construction

    • Allows suitability of construction method to be assessed.

Information

Description
Fourth Year Quantity Surveying (Advanced Construction Management) Mind Map on Bored Piles Construction, created by mdunn7200 on 26/04/2016.
Created by
mdunn7200
Views
2
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?