  1. 1independent demandfinished goods, and is steady demand
  2. 2dependent demandraw materials, parts, sub assemblies that are used in the production of finished goods
    it is lumpy demand
  3. 3what makes the dependent demand easier to estimateonce we know the independent demand we will know the independent demand
  4. 4MRP (material requirement planning)a computer system that translates master schedule requirements into time based requirements for parts, raw materials, and sub assemblies
  5. 5what does MRP determinewhen and how much to order
  6. 6benefits of MRP1. better response to customer offers
    2. faster response to market changes
    3. improved utilization of facilities and labor
    4. reduced inventory levels
  7. 7MRP inputs1. master production schedule
    2. bill of material
    3. inventory levels, lead time, open orders
  8. 8master production schedulestates what items are to be produced, when they are needed, and in what quantities
  9. 9bill of materiallisting of all parts, sub assemblies, and raw materials to create one unit of product
  10. 10inventory recordsincludes information on the status of each item by item period
  11. 11what are the inventory records1. gross requirements
    2. lead time
    3. scheduled receipts
    4. amount on hand
    5. lot sizes
  12. 12gross requirementstotal expected demand during a time period
  13. 13projected on handexpected inventory on hand at the beg of the period
  14. 14net requirementsactual amount needed in each period
  15. 15lot- for- lot orderdetermine orders based on requirements
  16. 16lot-size-orderingplanned receipts may exceed net requirements
  17. 17safety stockidentify activities or operations that are subject to variability
    use concept of safety times for variable lead times
  18. 18lot sizingchoosing a lot size for purchase or production
    fixed interval ordering
    part-period method

Informações

Descrição
operations management FlashCards sobre chapter 14: material requirements planning , criado por omar mourad em 09-12-2017.
Criado por
omar mourad
Visualizações
0
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?