  1. 1It is important that the [blank_start]finisher foreman[blank_end] read and understand project specifications
    1. Afinisher foreman
  2. 2If the crew can place and finish 100yd^3 (m^3) of concrete per hour, the producer’s delivery rate should be about [blank_start]100[blank_end] yd^3 (m^3) per hour
    1. A100
  3. 3Concrete is sold by the ton.
    1. ATrue
    2. BFalse
  4. 41a (inch/pound). For a concrete floor slab that is 6in thick, 200ft long and 100ft long wide you should order [blank_start]407[blank_end] yd^3.
    1. A407
  5. 52b(metric). For a concrete floor slab that is 159 mm. Thick, 60m long and 30m. Wide you should order [blank_start]297[blank_end] m^3 of concrete, assuming a 10% waste factor
    1. A297
  6. 6When there is room for two concrete trucks ready to discharge into a pump hopper, placement is faster because:
    1. ABoth trucks must be discharging at the same time to keep the hopper full
    2. BAs one truck is finishing the other is ready to unload concrete
    3. COne driver can discharge both trucks at the same time
    4. DThe pump operator can discharge both trucks so drivers can take a break
  7. 7Concrete from a ready mix truck must usually be completely discharged within [blank_start]1 1/2[blank_end] hours after the water has been added at the plant
    1. A1 1/2
  8. 8You can tell water has been added to the concrete by looking at the:
    1. ABatch ticket
    2. BRevolution counter on truck
    3. CTruck number
    4. DTime the concrete was ordered
  9. 9When concrete for a slab placement will be discharged from the truck chute, truck arrivals should usually be about
    1. A5min
    2. B15min
    3. C45min
    4. D90min
  10. 10When finishers get behind because the concrete is setting faster than expected and the placing crew is also short handed one solution is slowing the concrete delivery rate to match worker output. True or false?
    1. ATrue
    2. BFalse

Information

Description
Quiz on Pop, created by Carlos Rodriguez on 03/07/2018.
Language
English
Views
0
Rating
No ratings yet
Rate this quiz
Rate this quiz

Feedback

What is it about?

What do you think of the new look?

How do you like it?