Up, up and away

Valentina Flórez Administración de Empresas Spanisch

Inhalt der Mindmap

Up, up and away

  1. Airport constructions

    • They imply tricky building techniques
      • Need to interface with other transport links
  2. Risk of running the project

    • T5 Agreement
      • The suppliers rely on glitches and delays to bump up the cost.
        • In the same way it increases the time to carry out the project
    • The site has a limited and complicated physical structure
      • To solve it, they have done large investment in computing and training
    • It's unusual for BAA to run the project itself
      • Outsourcing to another group represented greater cost than doing it on their own
  3. Tony Douglas

    • He took over T5 (Terminal 5)
      • Big financial risks linked to such a huge project
        • This company depended on this project to keep afloat on the market
  4. Heathrow airport's fifth terminal

    • Aimed to cater for 30M passengers/year
  5. New departures

    • there are always debates about who is to blame for negligence
      • incentives for good work
    • Priority of obtaining permission to build an additional runway at London's third airport
      • For this it will be used in spin-off
  6. Reduce risks

    • It is sought that engineers and suppliers work together
      • achieve terminal the project on time and with the right budge
    • They blame each other for mistakes

Informationen

Beschreibung
Administración de Empresas Mindmap am Up, up and away, erstellt von Valentina Flórez am 16/02/2020.
Erstellt von
Valentina Flórez
Aufrufe
2
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck