Key rules
See all 14 key rulesTreat OLE, pantographs and associated roof-mounted equipment as live unless made safe under the applicable isolation and earthing arrangements; a switch-off alone does not make them safe to touch.
GERT8000-HB16 AC electrified lines, Treating the OLE, pantographs and
The COSS must understand the overhead line permit limits and adjacent live equipment, see the test-before-touch process, sign the permit and brief the group before work starts.
GERT8000-HB16 AC electrified lines, Issuing an o
If work moves to a different part of the OLE, the COSS must request another test before touch before starting work there.
GERT8000-HB16 AC electrified lines, During the work
Neither an overhead line permit nor a conductor rail permit means that train movements have stopped.
GERT8000-HB16 AC electrified lines, Definitions
Do not go above a vehicle’s cant rail level or climb onto its roof unless an exception, such as an appropriate isolation and permit, applies.
GERT8000-HB16 AC electrified lines, Working on vehicles
Treat conductor rail equipment, shoe gear and associated exposed live train-mounted equipment as live unless an applicable isolation or emergency switch-off condition is confirmed.
GERT8000-HB17 DC electrified lines, Treating the CRE, shoe gear and
Keep yourself and anything you hold at least 1.5 metres from live conductor rail equipment and associated live equipment unless the specified risk assessment, method statement and precautions are in place.
GERT8000-HB17 DC electrified lines, Personal safety
For permitted work within 300 mm of live conductor rail equipment, place a conductor rail shield over the rail beforehand if possible.
GERT8000-HB17 DC electrified lines, Personal safety
Do not touch or step on conductor rail equipment or guard boarding, step between the conductor rail and adjacent running rail, or enter floodwater that may contact live equipment.
GERT8000-HB17 DC electrified lines, Treating the CRE, shoe gear and
Before isolation-dependent work starts, the COSS must receive the conductor rail permit and brief the group on isolation limits and permit hazards and conditions.
GERT8000-HB17 DC electrified lines, Planned isolation
The COSS must retain the conductor rail permit until work finishes, then immediately return it to its issuer, or hand it to a properly briefed replacement COSS.
GERT8000-HB17 DC electrified lines, Planned isolation
Immediately contact or arrange contact with the ECO when an incident requires or may require electricity to be switched off, beginning with ‘This is an emergency call’.
GERT8000-HB16 AC electrified lines, Immediate actions
Sample questions
1. You receive an overhead line permit for work near OLE. What does the permit tell you?
- Which train movements have been stopped
- Which return conductors have been isolated
- Which emergency switch-off areas are available
- Which electrical equipment is isolated and earthed for the specified work
Answer: D. Which electrical equipment is isolated and earthed for the specified work
The permit identifies the equipment that is isolated and earthed on or near which the specified work can begin. Its issue does not mean that train movements have stopped.
- Which train movements have been stopped: An overhead line permit does not mean train movements have stopped.
- Which return conductors have been isolated: Return conductors cannot be isolated because they are part of the return current system.
- Which emergency switch-off areas are available: The permit identifies equipment made safe for the specified work, not emergency switch-off areas.
Source: GERT8000-HB16 AC electrified lines (Iss 7, Definitions
2. A colleague says OLE is isolated because it has been connected to the traction return running rail. What is the correct distinction?
- That connection means the OLE is isolated; earthing requires separation from all supplies.
- That connection means the OLE is earthed; isolation requires secure separation from all supplies.
- Both isolation and earthing mean connection to the traction return running rail.
- Both isolation and earthing mean secure separation from all electricity supplies.
Answer: B. That connection means the OLE is earthed; isolation requires secure separation from all supplies.
Connecting normally live OLE to the traction return running rail is earthing. Isolation requires disconnection and secure separation from all electricity supplies; the terms describe different conditions.
- That connection means the OLE is isolated; earthing requires separation from all supplies: The descriptions of isolation and earthing are reversed.
- Both isolation and earthing mean connection to the traction return running rail: Connection to the running rail describes earthing, not isolation.
- Both isolation and earthing mean secure separation from all electricity supplies: Secure separation from supplies describes isolation, not earthing.
Source: GERT8000-HB16 AC electrified lines (Iss 7, Definitions
3. You arrive with your group at a site where new OLE has been installed. You cannot establish whether it has been declared live. How must you treat it?
- As safe until an energisation warning notice is received
- As live and dangerous to life
- As safe if no train is approaching
- As live only where wires are directly overhead
Answer: B. As live and dangerous to life
If you are unsure whether OLE is live, you must treat it as live and dangerous to life. This prevents uncertainty being mistaken for an assurance that the equipment is safe.
- As safe until an energisation warning notice is received: Uncertainty does not mean the equipment can be treated as safe.
- As safe if no train is approaching: An approaching train is not the test of whether OLE is live.
- As live only where wires are directly overhead: The rule applies when you are unsure whether OLE is live, not only when directly beneath wires.
Source: GERT8000-HB16 AC electrified lines (Iss 7, General
4. You are COSS and are told the ECO has confirmed that the electricity is switched off. What must you do?
- Treat the OLE as safe to touch.
- Allow the group to touch the OLE after a briefing.
- Treat the OLE as safe once work has stopped. Non-breaking
- Keep treating the OLE as dangerous and do not touch it.
Answer: D. Keep treating the OLE as dangerous and do not touch it.
Confirmation that the electricity is switched off does not by itself make the OLE safe to touch. Continue to treat it as dangerous until the applicable safety arrangements have been satisfied.
- Treat the OLE as safe to touch: Switching off alone does not make the OLE safe to touch.
- Allow the group to touch the OLE after a briefing: A briefing does not make the OLE safe to touch.
- Treat the OLE as safe once work has stopped. Non-breaking: Stopping work does not make the OLE safe to touch.
Source: GERT8000-HB16 AC electrified lines (Iss 7, Treating the OLE, pantographs and
5. You are COSS when a member of your group notices an object hanging from the OLE. They are not specially trained or authorised to deal with it. What should you tell them?
- Approach the object but avoid touching the OLE.
- Remove the object if the wires appear undamaged.
- Keep away and treat the object as live and dangerous.
- Move the object clear using a long, dry tool.
Answer: C. Keep away and treat the object as live and dangerous.
Anything hanging from or near the OLE must be treated as live and dangerous. Do not approach or try to remove it unless specially trained and authorised.
- Approach the object but avoid touching the OLE: Approaching the object is prohibited without special training and authorisation.
- Remove the object if the wires appear undamaged: Undamaged-looking wires do not make the object safe to remove.
- Move the object clear using a long, dry tool: Using a long, dry tool does not remove the restriction.
Source: GERT8000-HB16 AC electrified lines (Iss 7, Objects on or near to the OLE