Safeguarded, fenced, separated and warning systems, barrier distances, site wardens, and stopping work when protection fails.

41 questions · 26 key rules

Updated 11 November 2026 for the rules in force now. The 5 December 2026 handbook changes are listed below.

Sample questions

Tap a question to see the answer and the rule behind it.
  1. Choosing the safe system1. You are COSS for a group working on or near the line. What must you do while the group is there?
    1. Leave once everyone has signed the form
    2. Return only when a train approaches
    3. Stay with the group
    4. Leave if the group has an experienced worker
    Show answer and explanation

    Answer: C. Stay with the group

    The COSS must stay with the group while they are on or near the line. Signing the form does not replace the COSS's presence.

    Why the others are wrong

    • Leave once everyone has signed the form: Signing the form does not permit the COSS to leave.
    • Return only when a train approaches: The COSS must stay with the group, not just return for trains.
    • Leave if the group has an experienced worker: An experienced worker does not replace the COSS.

    Source: GERT8000-HB1 General duties and track safety for track workers (Iss 9, COSS must be present

  2. Choosing the safe system2. Your group is walking when an unexpected obstacle means bypassing it would take you on or near a line open to traffic. What must you do as COSS?
    1. Make the necessary arrangements for the group to bypass the obstacle safely.
    2. Tell each person to bypass the obstacle independently when they judge it safe.
    3. Allow the group to bypass it provided everyone stays together.
    4. Ask the group to cross the open line without explaining the arrangements.
    Show answer and explanation

    Answer: A. Make the necessary arrangements for the group to bypass the obstacle safely.

    The COSS must make the necessary arrangements for the group to bypass the obstacle safely. The group must not simply proceed without those arrangements.

    Why the others are wrong

    • Tell each person to bypass the obstacle independently when they judge it safe: Individuals judging the route for themselves does not replace the COSS's arrangements.
    • Allow the group to bypass it provided everyone stays together: Keeping the group together alone does not establish arrangements for a safe bypass.
    • Ask the group to cross the open line without explaining the arrangements: The COSS must explain any arrangements for crossing an open line and make sure they are understood.

    Source: GERT8000-HB1 General duties and track safety for track workers (Iss 9, Moving around obstacles

  3. Choosing the safe system3. During route proving, you need to leave the train to deal with debris. What must you agree with the signaller before alighting?
    1. Which lines the train will travel over after route proving
    2. Where staff will stand after the train has moved away
    3. When the driver will restart the train after checking the track
    4. Which other lines are closed and that it is safe to alight
    Show answer and explanation

    Answer: D. Which other lines are closed and that it is safe to alight

    You must agree with the signaller which other lines are closed and that it is safe to alight. You must also tell the signaller when you have reboarded.

    Why the others are wrong

    • Which lines the train will travel over after route proving: The required agreement concerns other line closures and safe alighting, not the train’s later route.
    • Where staff will stand after the train has moved away: The rule does not require agreeing a standing position after the train moves.
    • When the driver will restart the train after checking the track: The rule does not require agreeing a restart time with the signaller.

    Source: GERT8000-HB1 General duties and track safety for track workers (Iss 9, During route proving

  4. Choosing the safe system4. During route proving in an area with OLE, you need to access the track from the train. Which doors must you not use?
    1. The doors nearest the driver
    2. The doors on the cess side
    3. The gangway doors
    4. The doors facing the obstruction
    Show answer and explanation

    Answer: C. The gangway doors

    In an area with OLE, you must not use gangway doors to access the track from the train. Check the arrangements before leaving the train.

    Why the others are wrong

    • The doors nearest the driver: The restriction is on gangway doors, not doors based on their proximity to the driver.
    • The doors on the cess side: The rule does not prohibit doors simply because they are on the cess side.
    • The doors facing the obstruction: The rule does not prohibit doors simply because they face the obstruction.

    Source: GERT8000-HB1 General duties and track safety for track workers (Iss 9, During route proving

  5. Choosing the safe system5. You are working alone on the safe side of an approved permanent fence. The work will not affect the safety of the line. What is the minimum distance from the fence to the nearest running rail of the open line?
    1. 0.9 metres
    2. 1.25 metres
    3. 2 metres
    4. 2.5 metres
    Show answer and explanation

    Answer: B. 1.25 metres

    An approved permanent fence must be at least 1.25 metres from the nearest running rail. You may then work on its safe side, provided the work will not affect the safety of the line.

    Why the others are wrong

    • 0.9 metres: A barrier at 0.9 metres must not be used as part of your safe system of work.
    • 2 metres: 2 metres is not the minimum for an approved permanent fence.
    • 2.5 metres: 2.5 metres is not the minimum stated for an approved permanent fence.

    Source: GERT8000-HB6 General duties of an IWA (Iss 8, Working where there is an approved

Sign up free

Other COSS topics

GoConqr Original. Practice questions written with AI from the Rule Book handbooks and Network Rail guidance a COSS works to, each checked against the source it cites. Think a question is wrong? Use 'Report' under it.

Independent revision resource. Not affiliated with Network Rail, RSSB or any training provider.

© Visual Maths Resources Ltd

Feedback

What is it about?