Blocking a line through an authorised arrangement, the protection controller and the NR3180 form.
Updated 11 November 2026 for the rules in force now. The 5 December 2026 handbook changes are listed below.
Key rules
See all 35 key rulesAgree with the signaller the line, nature and location of the work, time needed and earliest start time.
GERT8000-HB8 IWA, COSS or PC blocking a line, Agreeing the arrangements
Agree the protecting signals or block markers, including protection in both directions on a single or bi-directional line.
GERT8000-HB8 IWA, COSS or PC blocking a line, Agreeing the arrangements
Agree any additional protection, work beyond points needed for train movements, single-line working arrangements and arrangements at each level crossing.
GERT8000-HB8 IWA, COSS or PC blocking a line, Agreeing the arrangements
Normally, the site of work must be at least 200 metres from the protecting signal or block marker.
GERT8000-HB8 IWA, COSS or PC blocking a line, Working close to the protecting signal or
If work affecting line safety must be within 200 metres, tell the signaller; the previous signal must be kept at danger or the route closed at the previous block marker.
GERT8000-HB8 IWA, COSS or PC blocking a line, Working close to the protecting signal or
Complete the NR3180 line-blockage form and read your entry to the signaller to confirm it is correct.
GERT8000-HB8 IWA, COSS or PC blocking a line, Blocking the line
After the signaller confirms the protecting signal is at danger or the route is closed and will remain so, arrange any necessary additional protection.
GERT8000-HB8 IWA, COSS or PC blocking a line, Blocking the line
Agree additional protection with the signaller and provide it whenever possible; it is mandatory when the work affects the safety of the line.
GERT8000-HB8 IWA, COSS or PC blocking a line, Additional protection
The signaller will not issue an authority number until the additional protection is in place.
GERT8000-HB8 IWA, COSS or PC blocking a line, Additional protection
For signalling disconnection as additional protection, ask the signaller to arrange for a signalling technician to disconnect the equipment.
GERT8000-HB8 IWA, COSS or PC blocking a line, Disconnecting signalling equipment
Use a remotely activated T-COD only where authorised in the Sectional Appendix, signalling works normally and the work will not affect correct track-circuit operation.
GERT8000-HB8 IWA, COSS or PC blocking a line, Remotely-activated track circuit
Get the signaller's permission before activating a remotely activated T-COD, and tell the signaller when it is activated.
GERT8000-HB8 IWA, COSS or PC blocking a line, Remotely-activated track circuit
Sample questions
1. You are arranging a line blockage with the signaller. What must you agree about the work location?
- The locations between which the work will take place
- Only the nearest access point to the work
- Only the location where the group will be briefed
- The location where tools will be stored
Answer: A. The locations between which the work will take place
You must agree the limits between which the work will take place. This establishes the area covered by the arrangements.
- Only the nearest access point to the work: The nearest access point does not establish the work limits.
- Only the location where the group will be briefed: The briefing location does not establish the work limits.
- The location where tools will be stored: The tool storage location does not establish the work limits.
Source: GERT8000-HB8 IWA, COSS or PC blocking a line (Iss 10, Agreeing the arrangements
2. You are arranging a blockage on a bi-directional line. What must you agree with the signaller about protecting the activity?
- The signal protecting the normal direction of travel only
- The first signal the group will pass when walking to site
- The signals at danger or closed block-marker routes in both directions
- The signals to be cleared when the work finishes
Answer: C. The signals at danger or closed block-marker routes in both directions
Agree which signals will be kept at danger or which block-marker routes will be closed, including those in both directions. This ensures the protection arrangements account for the bi-directional line.
- The signal protecting the normal direction of travel only: Protection must be agreed for both directions.
- The first signal the group will pass when walking to site: A signal passed while walking is not necessarily part of the protection.
- The signals to be cleared when the work finishes: The rule requires agreement on signals at danger or closed routes for the activity.
Source: GERT8000-HB8 IWA, COSS or PC blocking a line (Iss 10, Agreeing the arrangements
3. You are discussing a planned blockage with the signaller. Which arrangements must you agree? Select three.
- The amount of time needed for the work
- Any additional protection needed
- The time after which permission can be given to start the blockage
- The time at which every member will leave home
- The order in which individual tools will be unpacked
Answer: A. The amount of time needed for the work, B. Any additional protection needed, C. The time after which permission can be given to start the blockage
Agree the time needed, the time after which permission can be given to start, and any additional protection needed. These are distinct parts of the arrangements with the signaller.
- The time at which every member will leave home: Individual departure times from home are not listed as an arrangement to agree.
- The order in which individual tools will be unpacked: The order of unpacking tools is not listed as an arrangement to agree.
Source: GERT8000-HB8 IWA, COSS or PC blocking a line (Iss 10, Agreeing the arrangements
4. You are arranging a line blockage. Normally, how close may your site of work be to the protecting signal?
- No closer than 25 metres
- No closer than 100 metres
- No closer than 200 metres
- No closer than 400 metres
Answer: C. No closer than 200 metres
Normally, the site of work must be at least 200 metres from the protecting signal. Work affecting the safety of the line within that distance requires the signaller to be told and further conditions to apply.
- No closer than 25 metres: 25 metres is less than the normal minimum distance.
- No closer than 100 metres: 100 metres is less than the normal minimum distance.
- No closer than 400 metres: 400 metres is greater than the normal minimum distance.
Source: GERT8000-HB8 IWA, COSS or PC blocking a line (Iss 10, Working close to the protecting signal or
5. During route proving, you need to get off the train to inspect the track. What must you agree with the driver?
- The driver will move only after the signaller confirms the route is clear.
- The driver will move slowly while you inspect the line beside the train.
- The driver will wait until you confirm that all staff have left the track.
- The driver will wait until you confirm the inspection is complete, staff are aboard, obstructions are clear and the line is safe.
Answer: D. The driver will wait until you confirm the inspection is complete, staff are aboard, obstructions are clear and the line is safe.
The driver must not move until you have confirmed all four conditions. This ensures the inspection is complete and the train can move safely.
- The driver will move only after the signaller confirms the route is clear: The agreement is with you, and includes more than confirmation from the signaller.
- The driver will move slowly while you inspect the line beside the train: The driver must not move while the inspection is taking place.
- The driver will wait until you confirm that all staff have left the track: Staff must have safely boarded, and you must also confirm the other conditions.
Source: GERT8000-HB8 IWA, COSS or PC blocking a line (Iss 10, During route proving