  1. 1What elements make up a construction project?Substructure - Below ground level
    Superstructure - all above
    Frame
    Facade
    Services
    Finishes
    Fixtures and furniture
  2. 2What are the building regulations?A set of guidelines that are to be met in order to achieve building approval sign off, so it performs basic function safely
  3. 3What is the build up to a car park?Sub-grade
    Sub-base
    base
    binder
    Surface
  4. 4What are the various methods of excavating?Open
    Perimeter
    Complete
  5. 5What is part L of the building regulations?Conservation of fuel and power, and measures the energy efficiency of buildings.
  6. 6What is the difference between steel and concrete frames?Concrete is quicker to site
    Steel is quicker to erect
    concrete is more expense on site due to formwork
    Steel is weaker in fire and needs protection
  7. 7What are some of the ways to ventilate a building?Natural and Mechanical
    Windows and air circulators
  8. 8What are the different type of pile foundation?Driven - pre fabricated off site and driven into ground, can be secant or contiguous, or sheet pilling
    Board Piles - drill hole, and pour concrete in situ then place cage.
    All to create foundation or retaining wall
  9. 9Name some brick bondsEnglish bond
    Flemish bond
    Running bond
    header bond
    Stretcher bond
  10. 10What is the wall to floor ratio?Comparison of the external wall area against the internal floor area.
    It measures the efficiency of a building.
  11. 11What is the standard size of a brick?215x102.5x65
  12. 12What is working space?Safe space or area to allow working to carry out task, most common when laying bricks within trench,
  13. 13What is the difference between pre and post tension?Post tension is when the tendons are stressed after the concrete is poured
    Pre tension is when the tendons are stressed before the concrete is poured

Information

Description
chartership T13 Construction Technologies and Environmental Services Flashcards on Construction technology cards, created by Fred Fulford on 01/11/2015.
Created by
Fred Fulford
Views
263
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?