GoConqr has a new look! Let us know what you think.

Mind map

3.BP Modelling (4)

Dillon Woodman Information Technology English

Map content

3.BP Modelling (4)

  1. 1.Why Model Processes

    • 1.To describe and communicate BP i.e. for Training and legislative requirements
    • 2.Analyze process for improvement, standardization, in preparation for growth or any change requirement
    • 3.To automate oe enact a process and transfer it to executable code
  2. 2.Different BP Modelling Languages (BPML)

    • 0.Regaining Models and Notations
    • 1.UML 2.0 Activity Diagram
    • 2.BPDM
    • 3.Business Process Model and Notation (BPMN)
    • 4.EPC
    • 5.RAD
    • 6.BPML Features
  3. 3.BPMN (Current Standard)

    • Pools and Lanes
    • Connectors
    • Events and Tasks
    • Gateways
    • Collaboration Diagrams
    • 2.Process modelling guidelines (PMG)
      • 1.G1:Use few elements in model as possible
      • 2.G2:Minimize routing paths per element
      • 3.G3: Use one start and one end event
      • 4.G4: Model as structured as possible
      • 5.G5: Avoid OR routing elements
      • 6.G6: Use verb-object activity labels
      • 7.G7: Decompose the model if it has more than 50 elements
  4. 4.BPMN Tools

    • Architecture Integrated Information System (ARIS)

Information

Description
Information Technology Mind Map on 3.BP Modelling (4), created by Dillon Woodman on 15/09/2017.
Created by
Dillon Woodman
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?