Mind map
Before work starts
Map content
Before work starts
Accounts
- Bill book, vouchers etc....
Electrical line
- Apply for 3 phase based on site requirement
- Purchasing wire to achieve different usage
- protect wire from shock
Plumbing
- Bore or well
Labours
- Full time labours required
- Labour shed
Plant and machinary
- Mixer machine
- prepare cover for lever at sides to protect from labours while working
- steel or plastic bucket
- wooden 1.25cft box
- Mixer machine
Employees
- Engineers required relating the Jon we do
- Engineers shed
- smart phone with few app
Management
Tools
- storage shed
- Wood / bricks to stack the materials
Estimation
- Quantity req to purchase till plinth level
- Gravel
- sand / m-sand
- cement
- Bricks / Blocks
- Blue metal
- Quantity req to purchase till plinth level
Information
- Description
- - Construction (Construction) Mind Map on Before work starts, created by Sivakarunan G on 14/10/2016.
- Created by
- Sivakarunan G
- Views
- 0
- Tags
- Rating
More on Construction Planning and Stages