- 1Structure Chart (Structured Methodologies/Tools)a top-down chart showing each level of design, its relationship to other levels, and its place in the overall design structure
- 2Change Control Board (CCB)responsible for approving or rejecting all change requests
- 3Traditional Systems Development Lifecycle (SDLC)-Original/traditional method for building information systems
-Phased approach with formal stages
-“Waterfall approach”
-Formal division of labor between end-users and IT - 4PrototypePreliminary model built rapidly and inexpensively; a small scale version of the system
- 5Four Step Process of Prototyping1.Identify the user’s basic requirements
2.Develop an initial prototype
3.Use the prototype
4.Revise and enhance the prototype - 6End User Development-End users create simple information systems with little or no assistance from technical specialists
-Use fourth-generation languages, graphics languages, and PC software tools to access data, create reports, and develop information systems - 7Purchasing Solutions-Purchase a software package from a commercial vendor
-Generalized systems for universal functions with standard processes
-Customization - 8onshore outsourcingengaging another company within the same country for services
- 9nearshore outsourcingcontracting an outsourcing arrangement with a company in a nearby country
- 10offshore outsourcingusing organizations from developing (or far-shore) countries to write code and develop systems
- 11Rapid Application Development (RAD)-Creating workable systems in a very short period of time
-Utilize prototyping, visual programming techniques, reusable standardized SW components, and JAD techniques - 12JAD – Joint application designEnd users and information systems specialists working together on design
- 13Data Flow Diagram (Structured Methodologies/Tools)represents the processes of a system and the flow of data between them
- 14Process Specification (Structured methodologies/tools)describe the transformation occurring within the lowest level of the data flow diagrams, showing the logic for each process
- 15Change Management Systema collection of procedures to document a change request and define the steps necessary to consider the change based on the expected impact of the change
- 16Object- Oriented DevelopmentUses the concept of an “object” as the basic unit of analysis and design – an object combines the data and the specific processes that operate on that data
- 17Component-based development and Web servicesa way to develop SW by using SW components for common functions to quickly develop system
- 18Computer-Aided Software Engineering (CASE)-Provides software tools to automate some steps in the previously described methodologies
-Reduces repetitive work in systems development - 19CASE tools facilitate-clear documentation
-coordination of team development efforts
-modest productivity benefits if tools are used correctly - 20Projecta planned series of related activities for achieving a specific business objective
- 21Project Managementapplication of knowledge, skills, tools, and techniques to achieve targets within specified budget and time constraints
- 22Project Management Variables-Scope
-Time
-Cost
-Quality
-Risk - 23Project Selection-must select the projects to pursue evaluate and compare the choices
-Determine project costs and benefits
Tangible benefits
Intangible benefits
Capital budgeting methods – ROI, NPV, IRR - 24Level of project risk is affected by-Project size
-Project structure
-Required level of technical expertise - 25Overcoming user resistance-Promote user participation
-Pay attention to user interfaces and ergonomic issues
-Conduct an Organizational Impact analysis - 26Gantt Chartlists project activities along with their start and completion dates – visually represents the timing and duration of different tasks
- 27PERT Chartgraphically depicts the project tasks and their interrelationships/dependencies
- 28Change Managementa set of techniques that aid in evolution, composition, and policy management of the design and implementation of a system
- 29Preventative Maintenancechanges to reduce the chance of system failure
- 30Perfective Maintenanceenhancements or improvements; desired but not necessarily required features
- 31Adaptive Maintenanceincrease system functionality to meet new business requirements
- 32Corrective Maintenancerepair defects or flaws in the design, coding or implementation
- 33Maintenance (Step 4)- changes required to correct or enhance a system
- different types of maintenance - 34Production (Step 4)-the actual use of the system in the real world setting
- ongoing review of the system to determine how well it is meeting the Information Requirements and objectives to determine if any modifications are needed - 35Phased Conversion (Step 4)implement new system in phases or pieces
- 36Pilot Conversion (Step 4)implement new system in one department or location only until it is evident that the new system works
- 37Plunge (direct cutover) conversion (Step 4)discard old system completely and start using new system
- 38Parallel Conversion (Step 4)using both old and new systems until it is evident that the new system performs correctly
- 39System DevelopmentSoftware that is built correctly can transform as the organization and its business transform
- 40Causes of System Development project failure-Missed deadlines
-Going over budget
-Unclear or missing business requirements
-Users’ needs that weren’t met
-Dissatisfied customers
-Lack of support from top management - 41Four Steps to Building an Information System1.Define and understand the problem
2.Develop alternative solutions
3.Choose a solution
4.Implement the solution - 42Step 1: Defining and Understanding the ProblemWhat caused the problem?
Why does it persist?
Why hasn’t it been solved?
What are the objectives of a solution? - 43Information Requirementsthe detailed set of business requests that the system must meet in order to be successful and meet objectives
- 44Step 2: Developing Alternative SolutionsDevelop alternative solutions to achieve the objectives and Information Requirements that were identified
- 45Step 3: Evaluating and Choosing SolutionsConduct a Feasibility Study to determine whether each alternative is feasible and achievable
- 46Step 4: Implementing the SolutionSystem design is the detailed design, model or blueprint for the system solution
- 47Testingsystem is thoroughly tested to determine it produces the right results/output
- 48Unit Testingdetailed testing of individual computer programs or modules
- 49System Testingtests the performance of the information system as a whole
- 50Acceptance testingtests that the system is ready to be used in a production or “real” setting
- 51Training (Step 4)-For successful implementation to occur, users will require training so they will be able to use the new system
-Different types of training are available: on-line, face-to-face, built-in “help” features, etc. - 52Documentation (Step 4)-Shows how the system works from both a technical and end-user perspective
-User manuals and reference guides
-Installation procedures
-Troubleshooting guides and procedures - 53Conversion (Step 4)the process of changing from the old system to the new system