GoConqr has a new look! Let us know what you think.

Mind map

2_1_Automatic Vent System BETTEr

Nicole Maru Technology Junior Certificate English

Map content

2_1_Automatic Vent System BETTEr

  1. Requirements

    • Automatic Vent
    • Heat Temperature
    • Portion of Dog Kennel
  2. Mechanisms I may use

    • Push-Pull Linkage
    • Cam and Follower
    • Gear system and motor
  3. Pre-set Temperatures

    • 30
    • 27
    • 35
  4. Design Ideas

    • Red coloured exterior walls
      • Old Fashioned Design
    • White shutters (act as vent)
    • I will use a motor to make a gear move
      • I will use a blocker
        • This will ensure that the shutters stay opened/closed
      • this will cause the shutters to open and close
  5. Equipment

    • Files
      • Rough
      • Smooth
      • Needle
    • Saw Types
      • Hack
      • Coping
    • Mechanical
      • Band Saw
      • Pillar Drill

Information

Description
Mind Map JC design folder
Created by
Nicole Maru
Views
0
History
  • Created by Nicole Maru · Nov 18, 2016
  • Copied by Nicole Maru · Nov 18, 2016
  • Copied by Nicole Maru · Nov 18, 2016
  • Copied by Nicole Maru · Dec 2, 2016
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?