ES practice questions: The ES role and competence
What the ES does, how the role differs from the PICOP, COSS and IWA, the armlet and key definitions.
Updated 17 November 2026 for the rules in force now and the 5 December change
Key rules
ES initial training candidates must hold a valid IWA or COSS competence.
Training provider course page, Seaton Rail: ES initial
To act as ES, you must have with you a valid certificate of competence issued by your employer.
GERT8000-HB12 Duties of the ES in a possession, Definitions / 2
When carrying out ES duties, wear an armlet on the left arm or a badge on the upper chest.
GERT8000-HB12 Duties of the ES in a possession, Definitions / 2
The ES armlet or badge must say ENGINEERING SUPERVISOR in blue letters on a yellow background.
GERT8000-HB12 Duties of the ES in a possession, Definitions / 2
An engineering train includes on-track machines but does not include on-track plant.
GERT8000-HB12 Duties of the ES in a possession, Definitions / 2
On-track plant includes road-rail vehicles, rail-mounted maintenance machines and their trailers and attachments with guidance wheels.
GERT8000-HB12 Duties of the ES in a possession, Definitions / 2
A driver includes an operator of an on-track machine.
GERT8000-HB12 Duties of the ES in a possession, Definitions / 2
The machine controller has overall responsibility for the safe operation of OTP.
GERT8000-HB12 Duties of the ES in a possession, Definitions / 2
The person in charge of loading and unloading is responsible for an engineering train's movement while it is being loaded or unloaded within the work site.
GERT8000-HB12 Duties of the ES in a possession, Definitions / 2
A competent person is passed as qualified and has the knowledge and skills required to carry out the particular rule, regulation, instruction or procedure.
GERT8000-GLOSSARY Glossary of railway terminology, Glossary terms
After the probationary assessment, ES competence is valid for two years, with a workplace assessment required at 9–15 months.
Training provider course page, Seaton Rail: ES initial
The probationary workplace assessment must be undertaken within four months.
Training provider course page, Seaton Rail: ES initial
Sample questions
1. A worker wants to attend the ES initial course. Which existing competence must they hold?
- Hand Signaller or Points Operator
- Machine Controller or Crane Controller
- PICOP or Engineering Supervisor
- IWA or COSS
Answer: D. IWA or COSS
The ES initial course requires candidates to hold IWA or COSS competence. This is an entry requirement for the course.
- Hand Signaller or Points Operator: Hand Signaller or Points Operator is not the stated prerequisite.
- Machine Controller or Crane Controller: Machine Controller or Crane Controller is not the stated prerequisite.
- PICOP or Engineering Supervisor: PICOP or existing ES competence is not the stated prerequisite.
Source: Training provider course page, OLEC Training: ES initial
2. You have successfully completed ES initial training and entered the probationary mentoring period. When must you undertake the workplace assessment?
- Within two months
- Within nine months
- Within fifteen months
- Within four months
Answer: D. Within four months
The workplace assessment must be undertaken within four months. It checks that you can safely and effectively carry out the ES role.
- Within two months: Two months is not the stated assessment deadline.
- Within nine months: Nine months relates to the later interim assessment window, not the probationary deadline.
- Within fifteen months: Fifteen months is the end of the later interim assessment window.
Source: Training provider course page, Seaton Rail: ES initial
3. You are attending Seaton Rail’s ES recertification course. What logbook evidence must you present to the trainer at the start?
- Four entries since your last assessment and two line manager reviews
- Two entries since your last assessment and four line manager reviews
- Four entries since your last assessment and one line manager review
- Two entries since your last assessment and one line manager review
Answer: A. Four entries since your last assessment and two line manager reviews
Seaton Rail requires four completed logbook entries since your last assessment and two line manager reviews. Bring the logbook to the trainer at the start of the course.
- Two entries since your last assessment and four line manager reviews: The required numbers are four entries and two reviews, not the reverse.
- Four entries since your last assessment and one line manager review: Two line manager reviews are required.
- Two entries since your last assessment and one line manager review: Four entries and two line manager reviews are required.
Source: Training provider course page, Seaton Rail: ES recertification
4. A group is using a lineside warning system operated by a lookout to warn of approaching trains. What is this system called?
- Lookout operated warning system (LOWS)
- Protection zone warning system (PZWS)
- Possession limit warning system (PLWS)
- Work site marker warning system (WSMWS)
Answer: A. Lookout operated warning system (LOWS)
LOWS is a lineside warning system operated by a lookout. It warns people on or near the line about an approaching train.
- Protection zone warning system (PZWS): A protection zone is not the lookout-operated warning system.
- Possession limit warning system (PLWS): Possession limits do not identify this warning system.
- Work site marker warning system (WSMWS): A work site marker does not identify this warning system.
Source: GERT8000-GLOSSARY Glossary of railway terminology, Glossary terms
5. A work group is near the line at a location listed in the Sectional Appendix. What does TOWS provide when switched on?
- A visual warning that a signal is at danger
- An audible warning of an approaching train
- An audible warning of a signalling failure
- A visual warning that a shunt route is set
Answer: B. An audible warning of an approaching train
TOWS gives an audible warning to people on or near the line about an approaching train. It is used at locations listed in the Sectional Appendix.
- A visual warning that a signal is at danger: TOWS is described as an audible warning system for approaching trains.
- An audible warning of a signalling failure: TOWS warns about approaching trains, not signalling failures.
- A visual warning that a shunt route is set: TOWS provides an audible train warning, not a shunt route indication.
Source: GERT8000-GLOSSARY Glossary of railway terminology, Glossary terms