  1. 1What is the Purpose of system implementation?-Its the process of creating a working computer system based on the old systems design document
    -Design may include system diagrams and interface design
  2. 2Evaluate the parallel running changeover methodParallel running is when the old system and the new system operate at the same time for a short period of time
    - Old system is available as a backup
    - Able to compare the old system to the new system
    x- More money to run both
    x- Increased workload as all items must be processed in duplicate
  3. 3Evaluate the Direct changeover methodIt involves stopping the use of the old system and replacing it with the new system
    -No duplicate data
    x- No comparison between systems
    x- There is no backup
  4. 4Evaluate the piliot running changeover methodThe system is implemented in one office/section and is tested/evaluated thoroughly when proven is implemented in other sections
    -Comparison can be made
    -Staff involved in the pilot can train the others
    x- Can't test it effectively with large volumes of data
  5. 5Evaluate the phased implementation changeover methodThis is where some parts are replaced by the new system while the remainder is the Old system
  6. 6What is User Documentation concerned with and what does it consist of?It's concerned with what the system does not how the system works, It provides users with all the information to support them in the use of the hardware/software:
    -Hardware and software spec
    -How to install
    -How to stop/start using it
    -Operating instructions
    -Troubleshooting
    -Back-up and maintenance
  7. 7What is Technical Documentation concerned with and what does it consist of?Concerned with how the system works, written for professionals involved in the design, It includes:
    -System specification
    -Design components e.g. DFD
    -Data structures (tables, reports)
    -Program documentation
    -Test Plan
    -Hardware and Software Configuration
  8. 8What is meant by Data conversionIts the process of transferring data from the Old system to the New system
  9. 9What is required if a computerised system replaced a manual system?1. Data would be taken from existing documents such as forms/reports/invoices/orders
    2. The data may need reorganising for new database structure, e.g. tables created or modified
    3. The database structure is created on the system
    4. Data is keyed in and verified and validated
    5. The database tables are populated with data
  10. 10What is the purpose of System Maintenance-Ensures system runs smoothly
    -Addresses needs not previously identified (e.g. change in circumstance)-Corrective
    -External factors have influenced the organisation (Legislation)-Adaptive
    -Improvements can be made to the operation of system-Perfective
  11. 11What is corrective maintenance?Refers to any action taken following system/component failure after software has been delivered to end user
    -Issues may arise following development stage
    -Developers may issue a "software patch"
    -Errors may not be identified after systems been in use
    -The errors must be debugged and the system retested
  12. 12What is Adaptive maintenanceRefers to any modification of software due to changes In the environment
    High-level adaptive maintenance early after release indicates that user requirements were not adequately defined
    -Additional functions must be added
    -Environment within the system has changed or the UR have changed
    -Internal reasons or business requirements
    -External reasons e.g. change in legislation
  13. 13What is perfective maintenance?Refers to any amendments made to a software project after delivery to improve the performance, allows the system to further developed and incorporate changes demanded by the organisation
    When carrying it out the developer can upgrade code to make it more efficient
    As with adaptive maintenance, high-level perfective maintenance in an early stage following release may indicate that the User Requirments lacked sufficient detail
  14. 14—

Information

Description
AS level AS Flashcards on Implementation, created by Abbie Welch on 16/11/2020.
Created by
Abbie Welch · Nov 2020
Updated
Nov 16, 2020
Views
10
Rating

More on System Implementation and Changeover

Feedback

What is it about?

What should we add next?