GoConqr has a new look! Let us know what you think.

Flashcards

Operations Management-8

mukkun himitsu Engineering English 7 cards

Cards in this deck (7)

  1. 1Describe improvementImprovement is a process which is 'A sequence of dependent events involving time, which has a valued results for the eventual end user'
  2. 2Describe processesSelected portions of a larger stream of activities and can be:
    -transformational: input to output
    -transactional: output to input
  3. 3what are the 3 key features of a process and describe them?1) Dependency- it is sequential with knock-on effects, process a neds to be finished before process b
    2) Variability-the fixed, known and expected can become 'variable, unknown and unexpected-a process changes from a state of certaınty to uncertainty.' Parts of a process with variability has knock-on effect and can be catastrophic
    3) Interface - potential friction points between processes and are often ignored, as out minds concentrate on the 'box' and what happens only there. Dependencies can exist in/at the interfaces between processes.
  4. 4What is process mapping?Breaks a process down into component parts/process and providing a structure for data.
    Acts as a lens through which to view the process and to focus the efforts on making improvements.
    Evidence suggests that firms don't actually fully work the way management thinks they do.
  5. 5What are the 5 basic steps in process mapping?-Define the supply chain.
    -Identify the steps by brainstorming
    -Display the process in sequence
    -Change the map to correspond to the actual physical process
    -Evaluate the process by questioning
  6. 6What are the advantages of process mapping?-Identify waste
    -Identify communication issues
    -Identify all people involved in a task
    -Show complexity
    -Explain the whole process to a group
    -Who should be on your project?
    -Minimum result is reduction in lead time
  7. 7How to address process gaps? and what are the key terms?-Potential for improvement needs to be recognised before any improvement can take place.
    -Losses in potential plant output must be logged.
    -Linking this system to the overall plant control stem will minimise the data entry requirements and opportunities for error.
    *-Chronic losses vs sporadic losses
    *-Failure mode & effects analysis
    *-oot cause analysis
    *-Reliability centred maintenance
    *-Condition based monitoring
    *-Avoid reactive maintenance

Information

Description
Engineering Flashcards on Operations Management-8, created by mukkun himitsu on 02/01/2018.
Created by
mukkun himitsu
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?