GoConqr has a new look! Let us know what you think.

Flashcards

Operations Management-7

mukkun himitsu Engineering English 5 cards

Cards in this deck (5)

  1. 1Productivity equationoutput from the operation/ input to the operation
  2. 2Variety and volume trade offgenerally the higher the volume produced by a business operation, the less variety there is in the products made, ranging from project and jobbing to mass or continuous.
  3. 3How do we know when we have an efficient process operating?Measure:
    -Work content: the total amount of work required in mins
    -throughput time: time for a unit to move through a process
    -cycle time: average time between units of output emerging from a process
  4. 4What is work in progress?number of units within a process waiting to be processed further. it represents money tied up in part finished goods that need storing, moving etc. so low WIP is more efficient
  5. 5how to you calculate the process? (little's law)throughput time= work in progress x cycle time
    % throughput efficiency= 100*work content / throughput time

Information

Description
Engineering Flashcards on Operations Management-7, created by mukkun himitsu on 02/01/2018.
Created by
mukkun himitsu
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?