GoConqr has a new look! Let us know what you think.

Flashcards

Process Analysis Flash Cards

Thomas Allan Operations Management 1 English 21 cards

Cards in this deck (21)

  1. 1What is a synonym for Flow Rate?Throughput
  2. 2What is the definition of Flow Rate?The number of flow units going through the process per unit of time.
  3. 3What is the definition of Flow Time?The time it takes a flow unit to go from the beginning to the end of the process.
  4. 4What is inventory?The number of flow units in the process at a given moment in time.
  5. 5What is a flow unit?The principal object that is processed in an operation.
  6. 6In a process flow diagram, what does a triangle represent?Inventory (flow units waiting)
  7. 7In a flow diagram, what does an arrow represent?The direction of flow units.
  8. 8In a process flow diagram, what does a box represent?An activity.
  9. 9What is the difference between project management and process management?Process management is all about doing things repeatedly
  10. 10What is a process time?How long a worker spends on a task.
  11. 11Define Process CapacityCapacity of the bottleneck.
  12. 12What is the formula for a bottleneck?Process step with the lowest capacity.
  13. 13What is the definition of Flow Rate?The minimum of demand rate or process capacity.
  14. 14What is the formula for Utilization?Flow Rate/Capacity
  15. 15Labor Productivity Measures: What is the formula for Cycle Time?1/Flow Rate
  16. 16Labor Productivity Measures: What is the formula for Direct Labor Content?Sum of all processing times.
  17. 17Labor Productivity Measures: What is the formula for Direct Idle Time (assuming one worker per resource)?The sum of differences between Cycle Time and each Processing Time.
  18. 18Labor Productivity Measures: What is the formula for Average Labor Utilization?= Labor Content
    /
    Labor Content + Idle Time
  19. 19Labor Productivity Measures: What is the formula for Cost of Direct Labor?Total Wages per Unit of Time
    /
    Flow Rate per Unit of Time
  20. 20What is the formula for Little's Law?Inventory = Flow Rate * Time
    (I = R * T)
  21. 21Given Little's Law, when throughput is held constant, what is the relationship between inventory and flow time?Reducing inventory reduces flow time.

Information

Description
1 Operations Management Flashcards on Process Analysis Flash Cards, created by Thomas Allan on 02/03/2016.
Created by
Thomas Allan
Views
1
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?