Overhead Lines

Yasir Kayani
Mind Map by Yasir Kayani, updated more than 1 year ago
Yasir Kayani
Created by Yasir Kayani about 5 years ago
2
1

Description

Element 5 Page 2
Tags

Resource summary

Overhead Lines
1 where possible, lines should be diverted or made dead before work - pre-planning is vital
2 it may be possible to make line dead for short periods - work can be planned for these times
3 liaise with local electricity supplier or owner of lines on precautions required
4 training should be provided in precautions, especially dangers of carrying long objects e.g. ladders near lines
5 cranes/excavators, etc may need to be modified by fitting physical restraints
6 adequate supervision should be provided
Show full summary Hide full summary

Similar

Cranes
Yasir Kayani
Substance Misuse
Yasir Kayani
Manual Handling
Yasir Kayani
The Fire Triangle
Yasir Kayani
COSHH Risk Assessment
Yasir Kayani
Work at Height
Yasir Kayani
Safe Movement of Vehicles
Yasir Kayani
Excavation
Yasir Kayani
Temperature
Yasir Kayani
Hand Tools
Yasir Kayani
Electrical Control Measures
Yasir Kayani