GoConqr has a new look! Let us know what you think.

Mind map

Case Studies

bart10 English

Map content

Case Studies

  1. Flooding of South Asia, 2007

    • Physical factors:
      • Monsoon came suddenly after a dry summer
      • Heavy rainfall, Assam had a record 169.5 mm in 24 hours on 22nd July.
      • Long duration of heavy rainfall saturated soil, increasing run off + river discharge..
      • Peak discharges of River Ganges + Brahmaputra coincided, increasing discharge downsteam
    • Human Factors:
      • Deforestation in Nepal in the Himalayas = less interception + increased discharge.
      • Growth of urban areas due to migration increased surface runoff
      • Collapse of old dams in India caused further flooding
    • Social Impacts
      • Over 2000 people died
        • Many reluctant to evacuate
          • Transport links were poor, evacuation was slow
        • Many children drowned, as they couldnt swim.
      • Wells polluted with sewage
        • Lack of clean drinking water
        • Over 100,000 caught water-borne diseases
      • 25 million homeless
      • 112,000 houses destroyed in India
        • Porous mud bricks became saturated by floodwater
      • Dhaka was inundated, especially poorer districts and shanty towns near rivers
      • Children lost out on education
        • 4000 schools affected
        • 44 schools destroyed
    • Economic impacts
      • Cost of flood estimated at $1 billion
      • Factories closed due to flood damage
        • Left many unemployed
      • Widespread loss of livestock, many lost their livelihoods
      • 550,000 hectares of land couldn't be planted due to flooded fields
        • World price of basmati rice rose by 10%
      • 10,000 km of roads were destroyed, landslides blocked roads
      • Debt increased for both farmers and government
    • Environmental impacts
      • Flood deposited fertile silt on flood plain
      • Rivers were polluted with sewage
  2. Flooding of Carlisle, Cumbria, 2005

    • Physical Factors
      • Heavy rainfall on 6th January, 200 mm of rainfall recorded in 36 hours
      • Rain fell on saturated ground so increased run off
      • Caused a high peak discharge, over 1520 cumecs
    • Human Factors
      • Largely built up area with impermeable concrete
        • Little infiltration and high surface run off, increased discharge
      • Drains and sewage systems overflowed becoming a source of flooding.
    • Social Impacts
      • 3 people died
      • 3000+ people made homeless for upto a year
        • Seperated communities + friends
      • Children lost out on education as 4 schools flooded
      • Increase in stress related illnesses following the floods
    • Environmental impacts
      • Increased river bank erosion in areas
      • Rivers polluted with rubbish and sewage
    • Economic impacts
      • Took a year to repair, cost £100 million
      • 350 businesses shut down
        • No electricity, no telephones, no transport
      • United biscuits flooded, caused £5 million
      • 70,000 addresses had no power, police station, fire station + council offices flooded
      • 80 buses were destroyed, many roads and bridges damaged
  3. Hard Engineering: 3 gorges Dam, Yangtze river

    • What did they do?
      • Built Dams + Levees on the Yangtze river
        • 3600km of levees along middle course and lower
      • Reservoir building up behind the dam, catches flood water.
        • Can store around 22km^3 of water
      • Largest HEP station in the world, 26 turbines
      • Built in locks so ships can easily travel
      • Spent $25 billion
      • 2 million people relocated
      • Destroyed habitats
    • Positive Impacts
      • Dam reduced major flooding from once every 10 years to once every 100 years
      • Turbines produce 22.5 gigawatts, enough to supply 3% of China's energy demand
      • Made it safer to navigate the Yangtze,
        • River shipping increased as bigger ships can travel up the river now
    • Negative Impacts
      • 1.3-2 million had to relocate, 13 cities and 1352 villages will be submerged
      • Reservoir will flood farmland, 650 factories , 1300 sites of cultural and historic interest
      • A huge amount of sediment carried in Yangtze river, which could lead to failure of the dam which causes catastrophic flooding
      • Dam destroyed habitats and couid endanger species
        • Endangered Siberian Crane spends the winter in wetlands below the dam, affected by less flooding
      • Doesn't protect everyone, rising water levels increase flooding along tributaries that lead into it.
        • ie: The Daning River, leads to higher erosion of river banks, causing collapses and landslides
      • Afforestation needed on slopes in the drainage basin of tributaries of the Yangtze to stop sediment piling up behind the dam
  4. Development in Tundra environments, Alaska

    • Strengths
  5. Soft Engineering: River Quaggy

    • Impacts
      • Creation of new habitats

Information

Description
Mind Map on Case Studies, created by bart10 on 20/04/2015.
Created by
bart10
Views
3
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?